My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-1999 DOUBLE CHECK
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9321
>
2300 - Underground Storage Tank Program
>
PR0231261
>
COMPLIANCE INFO_1996-1999 DOUBLE CHECK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 1:41:53 PM
Creation date
6/23/2020 6:45:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-1999 DOUBLE CHECK
RECORD_ID
PR0231261
PE
2361
FACILITY_ID
FA0002890
FACILITY_NAME
QUIK STOP MARKET #2120*
STREET_NUMBER
9321
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
080-180-05
CURRENT_STATUS
01
SITE_LOCATION
9321 N THORNTON RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231261_9321 N THORNTON_1996-1999 DOUBLE CHECK.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUG -30-1996 15.03 <br />DIV Dill i} <br />OILKEY'S ENGINEERING Is <br />U #,',�, <br />f ll' 1 <br />P.11 <br />This Site Safety and Health Plan (SS11P) is for the safety and health procedures <br />that will be followed during the construction work in the upgrading of the petroleum <br />piping. <br />The work will involve removing existing dispensers, islands, tank slabs and <br />petroleum piping. Purge petroleum line. Remove and dispose of petroleum piping ,vent <br />and vapor lines. Remove four (4) underground tanks. Two (2) 10,000 gallon and two (2) <br />8,000 gallon. Install two (2) new 12,000 gallon tanks. Install new product lines. Instal.] <br />two (2) new dispensers on new dogbone islands, new products and vapor piping and new <br />slabs. <br />Approximately five field personnel will be required for the work which is <br />scheduled to last approximately 22 days. <br />The SSHP is organized into the following groups of safety information: <br />1. Key Personnel <br />2, Hazard Analysis <br />3. Training Requirements <br />4. Personal Protective Equipment <br />5. Environmental Monitoring Plan <br />6. Medical Surveillance Requirements <br />7. Site Control Measures <br />8. Decontamination <br />9, Emergency Procedures <br />10. Documentation <br />KEYPERSONNEI.L <br />Project Manager - Mark Wilkey <br />Responsible for defining the scope of work, scheduling the work, organizing and <br />implementing compliance with the SSHP and for the performance and completion <br />of the construction work. <br />Site Safety Officer - Dale Adams <br />Responsible for planning the daily work, direction of the daily construction work, <br />holding the weekly site safety meeting, completing the site safety checklist and <br />daily job log, compliance with the site construction safety, communication with <br />environmental investigation personnel, identification of construction hazards. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.