Laserfiche WebLink
SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> oI.UNDER DISPENSER'`CONTAIIV2V11•NT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-541 <br /> ,�.,/ 490-54b <br /> ❑ L 9 CONTINUOUS ELECTRONIC MONITORING 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS ❑99.OTHER(Specify): <br /> 490-55 _ 490.56. <br /> PANEL MANUFACTURER: MODEL#: <br /> LEAK SENSOR MANUFACTURER: ago-s� MODEL#(S): ago-sa <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ ..YES b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ ..YES M<NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES I[f o.NO 490'61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. �a YES ❑b.NO 490.62 <br /> 2.UDC CONSTRUCTION IS1.SINGLE-WALLED ❑2.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: 490-64° <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: 1.LIQUID ❑2.PRESSURE ❑3.VACUUM <br /> ------ ---------------------- <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES Elb.NO 490-64b <br /> VII.PERIODIC SYSTEXTESTING <br /> 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65 <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REC2UIRED.(23 CCR 264±J) <br /> g-S—PI—LL--B—U--C–K--ET—S-A—R--E--T-ESTED <br /> USTBE --------SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 466-- ANNUALLY. 490-67 <br /> VIII.RECORDKEEPING' <br /> TheAollowing monitormg/mai9�rtenance records are kept for This facility: <br /> aron logs 490-69a E'Visual Inspection Records 490.6ab C1 Tank integrity testing results 490-68c <br /> ❑SIR testing results(and supporting documentation records). 490 d ❑ Tank gauging results(and supporting documentation records). 490-68e <br /> ❑ <br /> ATG Testing results(and supporting documentation records).49"sf ❑ Corrosion Protection 60-day logs 490-6sg <br /> 9 Equipment maintenance and calibration records. 490-63h <br /> IX.TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-691 <br /> REFEP,ENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> HIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> ('OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)49m% <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49o-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-6% <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69f <br /> ❑,SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-699 <br /> ®'OTHER(Specify):M69h,M69i "Written Procedures&Best Management Practices for Monitoring Double Containment UST Systems" <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> Names of contact person(s)for emergencies and monitoring alarms.490.70 <br /> X. COMMENTS/ADPNIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.49o-7n <br /> TANK OVERFILL PREVENTION(OR PROTECTION)IS ACCOMPLISHED BY THE FOLLOWING TWO(2)METHODS: <br /> 1. MECHANICAL OVERFILL VALVES INSTALLED IN DROP TUBES. <br /> 2. ALL SERVICE PENETRATIONS TO THE PRIMARY CONTAINMENT ARE CONTAINED WITHIN SUMPS. <br /> XL PERSONNEL RESPONSIBIIO IES i <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME N.SIDHU&RUSE KAUR 490.72 TITLE FRANCHISEES 490.73 <br /> NAME SAMI ALKOUSSA 490.74 TITLE DISTRICT ADVISOR 490.75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> OWNER/OPERATOR�SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATU 490-76 DATE: 490-77_��• SEPTEMBER 8,2009 <br /> I k / ❑2. 1 R e ' <br /> APPLICANT NAME(print): a9oaa APPLICANT TITLE: 490.79 <br /> MIKE KARVELOT,for QUIK STOP MARKETS,INC. DIRECTOR,ENVIRONMENTAL AFFAIRS <br /> UPCF UST-0 A%/ 007)3/4 " <br />