Laserfiche WebLink
WRITTEN OCE U S& BEST MANAGEMENT PRACTICES <br /> FOR MONITORING <br /> DOUBLE CONTAINMENT G O D STORAGE TSYSTEMS <br /> Quik Stop Market#120 <br /> 9321 North Thornton Road <br /> Stockton,California 95207 <br /> The gasoline storage and dispensing system at this location consists of two (2) 12,000 gallon, <br /> double-wall fiberglass,brine-filled interstitial,underground storage tanks serving two (2)double <br /> sided blend dispensers(3 product). Product lines are double-wall fiberglass. <br /> A. The interstitial space of each tank and product line is monitored continuously by probes <br /> within the brine reservoir and turbine sump,respectively. Float and chain assemblies in <br /> dispenser pans will trip shear valves in the event that dispensers leak. <br /> B. The TLS-350 Tank Monitoring and Leak Sensing System is manufactured by Veeder- <br /> Root. Leak conditions trigger visual and audible alarms located in the monitoring system <br /> control panel, as well as shut off power to turbines. <br /> C. The monitor control panel is located in the market office. The monitor is placed in test <br /> mode daily to check alarm function. Results are recorded on a"Daily Monitoring System <br /> Inspection Log". <br /> D. Monitoring is the responsibility of N. Sidhu, Franchisee, or his designated duty clerk. <br /> Maintenance of the monitoring equipment is the responsibility of Quik Stop Markets,Inc. <br /> All repairs will be authorized by Mike Karvelot, Director of Environmental Affairs. <br /> E. If an alarm occurs,the Franchisee will immediately contact the Quik Stop Gasoline <br /> Department,which will in turn dispatch a qualified service contractor to the site. The <br /> service contractor will determine the cause of alarm and advise Quik Stop of site <br /> conditions. If an unauthorized release to secondary containment has occurred, action will <br /> be immediately taken to implement the Simplified Response Plan. <br /> F. The monitoring panel and probes are checked and certified annually in June. Preventive <br /> maintenance and spill bucket testing is scheduled annually in conjunction with monitor <br /> certification. SB-989 testing is conducted triennially in August('03, 106,ad infinitum). <br /> G. A description of the gasoline system operation and operator's responsibilities are included <br /> in the Franchise Agreement. Initial training in operation of the tank system and <br /> monitoring equipment is conducted"on the job" under the supervision of Quik Stop <br /> personnel and the Designated UST Operator. <br />