Laserfiche WebLink
F. In -Tank Gauging / SIR Equipment: ED Check this box if tank gauging is used only for inventory contro <br />0 Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monit.)ring. <br />Complete the following checklist: <br />C] Yes <br />0 No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground 11, lilts? <br />EI Yes <br />0 No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />0 Yes <br />0 No* <br />Was accuracy of system product level readings tested? <br />0 Yes <br />1 0 No* <br />Was accuracy of system water level readings tested? <br />171 es <br />[I No* <br />Were all probes reinstalled properly? <br />171 Yes <br />171 No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section ", below, describe how and wnen tnese uenciencies were or wni ve currecteu. <br />G. Line Leak Detectors (LLD): E] Check this box if LLDs are not installed. <br />0 Yes <br />171 No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD )erforniance? <br />[I N/A <br />(Check all that apt)4v) Simulated leak rate: 03 g.p.h.. 0 0.1 g.p.h : El 0.2 g.p.h. <br />0 Yes <br />F-1 No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />ED Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />0 Yes <br />❑ No* <br />For mechanical LLDs. does the LLD restrict product flow if it detects a leak? <br />0 N,A <br />0 Yes <br />171 No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />0 N/A <br />0 Yes <br />0 No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring syste n is disabled <br />0 N/A <br />or disconnected? <br />0 Yes <br />F1 No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitilring system <br />0 N/A <br />malfunctions or fails a test? <br />0 Yes <br />El No* <br />For electronic LI -Ds, have all accessible wiring connections been visually inspected? <br />C7 <br />0 N/A <br />E] No* <br />I Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />Monitoring Certification Test Report <br />3 of 4 <br />