Laserfiche WebLink
piping -run isolation: <br />Wait time between applying <br />pressure/vac uum /water and <br />starting test: <br />Test ;tart Time: <br />initial Reading (R,): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-Ri): <br />Pass/Fail Threshold or <br />Test gesult: <br />5 MIN 5 MIN <br />10:00 10:00 <br />5 PSI 5 PSI <br />11:00 11:00 <br />5 PSI 5 PSI <br />I HR I HR <br />Pass 0 Fail 0'Pass, O Fail El Pass El <br />Comments — (include iql6rmation on.i-epairs made prior to lesting, atid reconinietidedfi)llo)v-iq).fi)l-.IiiileeI lests) <br />REPAIR BOOT INSIDE DSL I TANK ON PRODUCT SECONDARY LINE <br />NOV 2 0 2015 <br />Secondary Containment Test Results 3n(5 <br />