Laserfiche WebLink
1 0 0 <br />ilia lamour 1AIIN-111111► <br />Sump Diameter: <br />37.5" <br />.5 1.2w ­ <br />Sump Depth: <br />47" <br />47.5" <br />Sump Material: <br />FG <br />FG <br />Height from Tank Top to Top of <br />Hi chest Pi in Penetration: <br />23" <br />18" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />27" <br />17" <br />Condition of sump prior to testing: <br />FAIR <br />FAIR <br />Portion of Sump Tested' <br />36" <br />35" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />Yes n No F1 NA <br />NoEl NA <br />M Yes FEI <br />E] Yes F NoNA <br />Yes [] No ❑ NA <br />Turbine shutdown response time <br />6 SEC <br />6 SEC <br />E] Pass El Fail <br />[�j Pass 0 Fail <br />Is —system programmed for fail-safe <br />shutdown?* <br />Yes n No n NA <br />0 Yes [:1 No F1 NA <br />[:] Yes R No n NA <br />0 Yes E I No F1 NA <br />Was fail-safe verified to be <br />Yes [:1 No El NA <br />0 Yes n No [:] NA <br />El Yes [:1 No [—] NA <br />n Yes E I No El NA <br />operational: <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />15 MIN <br />15 MIN <br />Test Start Time: <br />12:24 <br />12:24 <br />Initial Reading (Rj): <br />3.0927 <br />4.0708 <br />Test End Time: <br />12:39 <br />12:39 <br />Final Reading (RF): <br />3.0926 <br />4.0703 <br />Test Duration: <br />15 MIN <br />15 MIN <br />Change in Reading (Rj.--Rj): <br />0.0001 <br />0.0005 <br />Pass/Fail Threshold or Criteria: <br />0.002 <br />0.002 <br />Test Result: <br />Z Pass C] Fall <br />0 Pass El Fail <br />E] Pass El Fail <br />[�j Pass 0 Fail <br />Was s I ensor removed for testing? <br />0Yes MNo0NA <br />0 Yes [:1 No [—] NA <br />R Yes [] NoE]NA <br />[:IYes []No[:]NA <br />Was sensor properly replaced and <br />verified functional after tes <br />Yes n No [:] NA <br />Z Yes M No E] NA <br />R YesFj No ❑ NA <br />El Yes E I No Ej NA <br />Comments — (include information on repairs made prior to lesting, atidrecomiiiendedfi)lloit--iil),Ibt,Jriiledtests) <br />REPAIR BOOT INSIDE DSL 1 TANK ON PRODUCT SECONDARY LINE RECEIVED <br />NOV 2 0 2015 <br />ENy1,R0NMEN_-r <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicates: with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRC13 LG -160) <br />Secondary Containment Test Results 4 of 5 <br />