Laserfiche WebLink
SIVRCB, January 2002 <br />8. SPILL/OVERFILL CONT <br />Page of <br />ENT BOXES <br />Facility is Not Equipped With Spill/Overffll Containment Boxes 0' <br />Spill/Overfill Containment Boxes are Present, but were Not Tested 0 <br />Test Method Developed By: <br />11 Spill Bucket Manufacturer <br />0 Other (Specify) <br />0 Industry Standard F-'j Professional Engineer <br />Test Method Used. <br />OPressure <br />0 Other (Specify) <br />LJ Vacuum LJ Hydrostatic <br />Test Equipment Used: <br />Equipment Resolution: <br />Spill Boz # Spill Box # Spin Box # <br />Spill Box # <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />startin,g test: <br />Test Start Time: <br />Initial Reading (R,): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-Rj): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result <br />Fagj D,P <br />;0 Fail` U Yass 0 Fail <br />-01 Pass7 0 Fair <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failediests) <br />