Laserfiche WebLink
FROM : JIM THORPE OIL, INC. FAX NO. : 209 368-i851 Dec. 20 2002 04:23PM P3— * 6 <br />This monitoring progtam must be kept at the UST location at all times. The inforrnation on this monitoring program are <br />conditions of the operating perrnit. The permit holder must notify (the IQral . enc within 3h0 days of anY changes to the <br />monitoring procedures,equired by required <br />2632 d) and 2641(to obtain approval h before makingchange. <br />Facility Name: pacif is pride Card Lock Facilit <br />351 N. Beckman Rd., Lodi, CA 95240 <br />Facility Address: <br />A. Indicate the frequency of monitoring: <br />Tank: Monitors are ced <br />Piping: Same as above <br />B. 'What methods and equipment, identified by name and model, will be used for <br />performing the monitoring: Ronan x 76 LVC5-5 Leak Detector . Monitoring <br />Tanks: <br />Piping: S stem with 10 1. <br />C. Describe the location(s) where the monitoring will be performed (facility plot plan <br />should be attached): in the computor house located on the NW side of <br />the pump island. <br />D. List the names) and title(s) of the person responsible for monitoring and/or <br />maintaining the equipment: <br />Van De Pol Enterprises - Monito i <br />,m Thcirne Oil. Inc. - Equipment maintenencP. <br />E. Reporting format for monitoring: <br />Tank: A log will be kept, to re art <br />Piping: Same as above* <br />F. Describe the preventive maintenance schedule for the monitoring equipment. <br />Note: Maintenance must be in accordance with the manufacturer's maintenance <br />schedule but not less than every 12 months. Systems check every six months. <br />G. Describe the training necessary for the operation of UST system, including piping and <br />monitoring equipment. Factory training after instal,ation. <br />