My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
351
>
2300 - Underground Storage Tank Program
>
PR0231310
>
COMPLIANCE INFO_1986-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 2:12:40 PM
Creation date
6/23/2020 6:46:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2003
RECORD_ID
PR0231310
PE
2361
FACILITY_ID
FA0003773
FACILITY_NAME
VAN DE POL ENT INC/PACIFIC PRIDE
STREET_NUMBER
351
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04903015
CURRENT_STATUS
01
SITE_LOCATION
351 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231310_351 N BECKMAN_1986-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• OPTION 1B <br />ARTICLE 3, SECTION 2632 <br />MONITORING <br />1. Manual and visual monitoring program for motor vehicle fuel tanks only. <br />2. Electronic monitors (Article 3, Section 2632(c) (2A,2C)). <br />A. Connected to audible/visual alarm(s) <br />B. Type of detector <br />1. Brand Name <br />2. Model number <br />3. Sensor type: <br />a,_.-,.-Va o r <br /><b: Liquid <br />c. Both <br />4. Sensor specification: <br />a. Detection limits t <br />b. Zero out capabilities <br />c. System capable of annual testing <br />5. Brochures provided <br />6. Manufacturer's written installation instructions provided. <br />�F 3. Specify type of monitoring system (Article 3, Section 2632(d) 1, 2, 2A, 2B). <br />A. Written monitoring plan provided <br />B. Written response plan provided <br />4. Hard wiring of electronic monitoring system is required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.