Laserfiche WebLink
SWRCB, January 2002 <br />Page of <br />9. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />X Pressure <br />❑ Vacuum <br />❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Equipment Resolution: 1/10-15 Psi <br />Piping Run #1 <br />Piping Run #2 <br />Piping Run # 3 <br />Piping Run # 4 <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />Approx. 80' <br />Approx. 20' <br />Approx. 85' <br />Approx.25' <br />Product Stored: <br />Dyed Diesel <br />Dyed Diesel Vent <br />Premium 91 <br />Premium 91 Vent <br />Method and location of <br />Test boot at STP <br />Test boot at Vent Box <br />Test boot at STP <br />Test boot at Vent Box <br />piping -run isolation: <br />Piping Sum #1 <br />Piping Sum #2 <br />Wait time between applying <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />pressure and starting test: <br />Test Start Time: <br />9:55 <br />10:00 <br />10:20 <br />10:10 <br />Initial Reading (RI): <br />3 Psi <br />3 Psi <br />3 Psi <br />3 Psi <br />Test End Time: <br />10:55 <br />11:00 <br />11:20 <br />11:10 <br />Final Reading (RF): <br />3 Psi <br />3 Psi <br />3 Psi <br />3 Psi <br />Test Duration: <br />1 Hour <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF -RI): <br />0 Psi <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />Criteria: <br />'Test .esuit: <br />Vass, <br />PassVas- <br />P3 n.,, ,. <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for <br />failed tests) <br />