Laserfiche WebLink
SWRCB, January 2002 Page of <br />10. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: <br />X Pressure <br />❑ Other (Spec) <br />❑ Vacuum <br />❑ Hydrostatic <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />EMIMMIM <br />MENEM Piping Run #5 <br />Piping Material: Fiberglass <br />Piping Run #6 <br />Fiberglass <br />Equipment Resolution: 1/10-15 Psi <br />Piping Run # 7 Piping Run # 8 <br />Fiberglass Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />Approx. 75' <br />Approx. 35' <br />Approx. 100' <br />Approx.65' <br />Product Stored: <br />Regular 87 <br />Regular 87 Vent <br />Gasoline Vapor <br />Diesel -T-4 <br />Method and location of <br />piping -run isolation: <br />Test boot at STP #3 <br />Test boot at Vent Box <br />Test boots at <br />STP#2&3 <br />Test boot at STP#4 <br />Wait time between applying <br />pressure and starting test: <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />Test Start Time: <br />10:35 <br />10:40 <br />10:50 <br />10:55 <br />Initial Reading (Ri): <br />3 Psi <br />3 Psi <br />3 Psi <br />3 Psi <br />Test End Time: <br />11:35 <br />11:40 <br />11:50 <br />11:55 <br />Final Reading (RF): <br />3 Psi <br />3 Psi <br />3 Psi <br />3 Psi <br />Test Duration: <br />1 Hour <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF -RI): <br />0 Psi <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />Test Result: <br />Pass <br />Piss, <br />Pa$ <br />Piss <br />Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />201 <br />