Laserfiche WebLink
SWRCB, January 2002 Page of <br />12. PIPING SUMP TESTING <br />Test Method Developed By: <br />❑ Sump Manufacturer <br />❑ Industry Standard X Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />❑ Pressure <br />❑ Vacuum <br />X Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Caldwell Level Change Indicator <br />Equipment Resolution: <br />.002 <br />Sump# [-Dyed <br />Sump # 2-91 <br />Sump # 3-87 <br />Sump # 4 -Diesel -T-4 <br />Diesel <br />Sump Diameter: <br />42" <br />42" <br />42" <br />42" <br />Sump Depth: <br />45" <br />39'/2" <br />38" <br />37" <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />16" <br />20" <br />22" <br />18 '/2" <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />15" <br />15" <br />15" <br />13 '/2" <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Dry <br />Dry <br />Dry <br />Dry <br />Portion of Sump Tested' <br />Water Line 18" <br />Water Line 23" <br />Water Line 24" <br />Water Line 20 '/z" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />Yes <br />Yes <br />Yes <br />Yes <br />product and water)?* <br />Turbine shutdown response time <br />Not Alarmed <br />Not Alarmed <br />Not Alarmed <br />Not Alarmed <br />Is system programmed for fail-safe <br />Yes <br />Yes <br />Yes <br />Yes <br />shutdown?` <br />Was fail-safe verified to be <br />No <br />No <br />No <br />No <br />operational?* <br />Wait time between applying water <br />5 Minutes <br />5 Minutes <br />5 Minutes <br />5 Minutes <br />and starting test: <br />Test Start Time: <br />10:00 <br />10:05 <br />10:10 <br />10:50 <br />Initial Reading (Rj): <br />.001 <br />.001 <br />.001 <br />.001 <br />Test End Time: <br />10:30 <br />10:35 <br />10:40 <br />11:20 <br />Final Reading (RF): <br />.001 <br />.001 <br />.001 <br />.001 <br />Test Duration: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Change in Reading (RF -RI): <br />0 <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />.005/30 Minutes <br />.005/30 Minutes <br />.005/30 Minutes <br />----- <br />Test lese►it• <br />bass <br />1Pass <br />Pass <br />0 <br />Pais <br />Was sensor removed for testing? <br />Yes <br />Yes <br />Yes <br />Yes <br />Was sensor properly replaced and <br />Yes <br />Yes <br />Yes <br />Yes <br />verified functional after testin ? <br />Comments — (include information on repairs made prior to testing, and <br />DEPARTmENT <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />