Laserfiche WebLink
Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />Approx. 45' <br />Approx. 50' <br />Approx. 100' <br />Approx.55' <br />Product Stored: <br />Diesel Vent T-4 <br />Diesel -A -B T-5 <br />Diesel -A -B T-5 <br />Diesel Vent T-5 <br />Method and location of <br />piping -run isolation: <br />Test boot Vent Box <br />Test boot at STP <br />Piping Sum #5 <br />Test boot at STP <br />Piping Sum #5 <br />Test boot at Vent Box <br />Wait time between applying <br />ressure and starting test: <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />Test Start Time: <br />11:05 <br />11:15 <br />11:25 <br />11:35 <br />Initial Reading (RI): <br />3 Psi <br />3 Psi <br />3 Psi <br />3 Psi <br />Test End Time: <br />12:05 <br />12:15 <br />12:25 <br />12:35 <br />Final Reading (RF): <br />3 Psi <br />3 Psi <br />3 Psi <br />3 Psi <br />Test Duration: <br />1 Hour <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF -R,): <br />0 Psi <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />'fest Result" <br />Comments —(include information on repairs made prior to testing and recommended follow-up for failed tests) <br />