Laserfiche WebLink
4t' i'C� i i to h • 1 b a �Iid i i e *Nye" s'"^�^:y °i Y f"h <br />iAk <br />ONE a <br />Ix T ♦ f i iS / Y { 6 ¢ +�� + ; a fJT _� `7ik �3 R, P b > 9 } <br />w <br />For FX2V models <br />' <br />a. Remove 1/4 -inch pipe plug from tank test port in the <br />MIM if iiow, is restricted to about 3 gpm (11 1pmor less, , <br />Packer (on 6 -inch Big -Flo applications, remove the <br />with the nozzle open, the teak detector has not <br />1/4 -inch pipe plug from the nisei/flanpc assembly). <br />opened. Repeat step 8a with increased running <br />b. Apply a UL -classified non-toxic pipe thread sealant to <br />time of pump to insure the purging of all air. All air <br />the 1/4 -inch NPT 45 -degree elbow and install in tank <br />must be. purged from the system or the leak <br />test port of the packer. On 6 -inch Big -Flo applications, <br />detector will restrict flow to about 3 gpm (11 1pm). <br />the 1/4 -inch NPT 45 -degree elbow may be installed <br />'9. Affix the enclosed decals to the dispenser dial glass on grade <br />into the riser/flange assembly.of <br />gasoline upon which the leak detector is being installed. <br />c, Apply UL -classified non toxic pipe thread sealant to <br />Additional decals are available; call customer service at <br />the 1/4 -inch NPT hex nipple and install on 45 degree <br />1-800-262-7539: h <br />elbow that. is, .in the tank test port (or on 6 inch Big -Flo <br />10, inspect all threaded joints to assure they are tight and not <br />riser/flange assembly. <br />leaking. <br />d. Apply a UL -classified non-toxic pipe thread sealant to <br />the 1/4 -inch NPT tee and install on the hex nipple to <br />:Test of the Leak Detector <br />accommodate both the vent tube and the snap tap: <br />e. Apply a UL -classified non-toxic pipe thread sealant to <br />U.S. Environmental Protection .Agency (EPA) regulations require <br />the threads of the 1/4 -inch NPT 90 -degree elbow vent <br />annual verification of operation of leak detector. To assure <br />tube fitting.and.insialL.in_the_tee::__:__ .::_. <br />maintenance of leak detection capability, Red Jacket requires that: <br />f. Apply a UL -classified non-toxic pipe thread sealant to <br />operation of thee mechaiucal7eak:detector be verified by testuig upon <br />the threads of the 1/4 -inch NPT straight vent tube <br />start-up and that testing of the'leak detector be performedroutinely at <br />fitting and install.in the leak detector vent opening in <br />least annually. <br />the cap of the leak detector. " <br />-' g. - Install the vent. tubing into both fittings and tighten per_ <br />"lest procedure options for mechanical leak <br />instructions on package, <br />detectors are explained in Red Jacket Engineering <br />h. To install snap tap connectors in FX2V/FX2DV <br />Reports, RJ20 and RJ21. The Red Jacket:Snap Tap <br />models, apply a UL -classified non-toxic pipe thread <br />Connectors allow the l'X2V/FX2D �.Heak detector. <br />to be tested with the. FXV Snap Tap Tester as'aa <br />sealant to the snap tap connectors and install one in the <br />option to the above test methods. See Red Jacket <br />body of the FXV leak .detector and the other, in the tee <br />literature #042-111-1 for test instructions using <br />attached to the hex nipple attached to the 45 -degree. <br />Snap Tap Connectors. <br />elbow installed in the tank test -port of the packer. On 6- <br />11. The top cover on the Red Jacket leak detector is designed to <br />inch Big -Flo applications, install the two snap tap <br />accommodate sealing wire which can. be used. to <br />connectors -ane in the body of theFXV Teak detector <br />.a <br />discourage tampering or the unauthorized removal of leak <br />and one in the riser/flange assembly. <br />detector. (See Figure 2). <br />i. Attach and crimp loop of the retaining tether <br />around the Snap Tap threads.® <br />j. Replace the caps over the. quick -connect couplings and <br />It should be noted that if the dispensing system (the <br />tighten snugly. <br />solenoid valve and the nozzle) is opened previous to <br />the completion of the line test,. the FXV" Series will <br />detect this opening as a,.leak and restricted flow <br />" DO NOT overtighten. <br />will result. Closing of the nozzle(s) for a period of <br />time adequate to allow completion of the line test <br />® See technical bulletin #042-111-1 for use of Snap <br />will allow the leak detector to open, Once opened, <br />Tap Connector Assembly. <br />full pump floiy can be provided. <br />7. Connect power to pump at the load center. <br />3. :Tear remaining air from system as follows: <br />a. Turn on dispenser that is farthest from the leak detector <br />-but do not open nozzle -Waic4 or ---5 minutes or more. <br />Look for leaks on parts worked on. <br />b. Shutoff the pump and allow it to stand four or five <br />minutes: Then start the pump again and open the <br />FX2V / FX2DV TETFIERED <br />.nozzle farthest from the leak detector. <br />CAP <br />c. Continue to dispense enough gasoline, about 20 to 30 <br />gallons (76 to 114 liters), to pump ALL air from the <br />systhm <br />SNAP TAP <br />Figure 2 <br />NT TUBE <br />