My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
351
>
2300 - Underground Storage Tank Program
>
PR0231310
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2022 4:33:55 PM
Creation date
6/23/2020 6:46:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231310
PE
2361
FACILITY_ID
FA0003773
FACILITY_NAME
VAN DE POL ENT INC/PACIFIC PRIDE
STREET_NUMBER
351
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04903015
CURRENT_STATUS
01
SITE_LOCATION
351 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231310_351 N BECKMAN_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
478
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Results of Testing/Servicing <br />Software Version Installed: 123.01 <br />mpiete the <br />following cn <br />Kiist: <br />Is the audible alarm operational? <br />Yes <br />0 No* <br />Yes <br />0 No* <br />Is the visual alarm operational? <br />s. <br />_j31 'No* <br />Vvere all sensors visually Inspected, functionally tested, and confirmed operational? <br />Yes <br />No* <br />proper <br />_ ors Installed at lowest point of secondary containment and positioned so that other equipment will not Interfere with their proper <br />W�e all sensors 8 <br />Aration?' <br />El Yes,- <br />0 -Ne- <br />—If-alarmsere relayed to a remote monitoring station, Is all communications equipment (e.g., modem) operational? <br />• Yes <br />N/A <br />0 No* <br />For pressurized piping systems, does the turbine automatically shut down If the piping secondary containment monitoring system detects a leak, <br />0 N/A <br />falls to operate, or Is electrically disconnected? If yes: which sensors Initiate positive shut -down? (Check all that apply) 0 Sumprrrench <br />Sensors; 0 Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks bpd sensor failure/disconnection? 0 Yes; 0 No. <br />• Yes <br />0 No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no mechanical overfill prevention valve is <br />installed), Is the alarm visible and audible at the tank fill point(s) and operating properly? if so, at what percent of tank capacity <br />0 N/A <br />overfill warning <br />I <br />does the alarm trigger? 90% <br />[I Yes <br />0 No <br />Was any monitoring equipment replaced? If yes, Identify specific sensors, probes, or other equipment replaced and list the manufacturer name <br />and model for all replacement parts In Section E, below. <br />[]Yes* <br />0 No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />0 Product; 0 Water. If yes, describe causes In Section E, below. <br />R Yes <br />0 No* <br />Was monitoring system set-up reviewed to ensure � settings? Attach set up reports, if applicable <br />- N Yes <br />1 0 No* <br />I Is all monitoring equipment operational permanufacturer's specifications? <br />in Section E below, describe how and when these deficiencies were or will be corrected. <br />ARIS ON SITE. DSL FILL FAILED AND 91 LD FAILED. AND DSL B LD FAILED AS WELL . ** to be <br />E. Comments: replaced & retested by Elite IV <br />Monitoring System Certification Page 2 of 4 2/21/07 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.