Laserfiche WebLink
F. In -Tank Gauging / SIR Equipment: ® Check this box if tank gang ng is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed If In -tank gauging equipment Is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ <br />Yes <br />❑ <br />No* <br />Has all Input wiring been inspected for proper entry and termination, including testing for ground faults? <br />L7 <br />Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ <br />Yes <br />❑ <br />No* <br />Was accuracy of system -product level readings tested? <br />[] <br />Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />In Section H, below, describe how and when these deficiencies were or will be corrected. <br />ine Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />P.u.....lnt'n 66n fnllnuAnn n6un411e}• <br />® <br />Yes <br />❑ <br />No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />❑ <br />N/A <br />Simulated leak rate: ® 3 g.p.h.; ❑ 0.1 g.p.h; ❑ 0.2 g.p.h. <br />® <br />Yes <br />❑ <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />® <br />Yes <br />❑ <br />No* <br />Was the testing apparatus properly calibrated? <br />® <br />Yes <br />❑ <br />No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ <br />N/A <br />_ <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? _ <br />® <br />N/A <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />® <br />NIA <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />® <br />NIA <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />® <br />N/A <br />® <br />Yes <br />❑ <br />No* <br />Were all Items on the equipment manufacturer's maintenance checklist completed? <br />In Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. comments: Leak Detectors <br />DSL 160 6 26 13 PASS <br />DSL B 150 FAILED <br />91 140 FAILED <br />87 140 3 26 21 PASS <br />RED DSL 160 3 26 14 PASS <br />DSL 2 170 4 26 12 PASS <br />Monitoring System Certification Page 3 of 4 2/21/07 <br />