My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231382
>
COMPLIANCE INFO_1998-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 2:04:33 PM
Creation date
6/23/2020 6:46:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2009
RECORD_ID
PR0231382
PE
2361
FACILITY_ID
FA0004139
FACILITY_NAME
Plaza liquor and Gas
STREET_NUMBER
2420
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95242
CURRENT_STATUS
01
SITE_LOCATION
2420 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231382_2420 W TURNER_1998-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
474
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />4. TANK ANNULAR TESTING <br />Page 2 <br />Test Method Developed By: F-1 Tank Manufacturer Fx Industry Standard Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure Vacuum El Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: <br />Tank # 1 REG Tank # 3 DIE <br />Equipment Resolution: <br />Tank # Tank # <br />Is Tank Exempt From Testing? 1 <br />El <br />Yes <br />LIJ F---1 <br />No <br />Yes <br />X <br />No <br />Yes <br />No <br />Yes <br />No <br />Tank Capacity: <br />10,000 <br />10,000 <br />Tank Material: <br />DW STEEL <br />DW STEEL <br />Tank Manufacturer: <br />unknown <br />unknown <br />Product Stored: <br />REGULAR <br />DIESEL <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5min <br />5min <br />Test Start Time: <br />9:40 <br />11:54 <br />Initial Reading (RI ): <br />7hg <br />7hg <br />Test End Time: <br />10:40 <br />12:54 <br />Final Reading (RF ): <br />7hg <br />7hg <br />Test Duration: <br />lhr <br />lhr <br />Change in Reading (RF - RI ): <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />1.7hg <br />1.7hg <br />Was sensor removed for testing? X Yes N NA X Yes N NA Yes N tes N NA <br />Was sensor properly replaced and � F-71 <br />� ❑ � cverified functional after testing? Ye N NA Ye N NA Ye N Ye N NA <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br />containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment <br />testing. {California Code of Regulations, Title 23, Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.