My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231382
>
COMPLIANCE INFO_1998-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 2:04:33 PM
Creation date
6/23/2020 6:46:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2009
RECORD_ID
PR0231382
PE
2361
FACILITY_ID
FA0004139
FACILITY_NAME
Plaza liquor and Gas
STREET_NUMBER
2420
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95242
CURRENT_STATUS
01
SITE_LOCATION
2420 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231382_2420 W TURNER_1998-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
474
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002. <br />• Page 3. <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />❑X <br />El <br />Tank Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />Other (Specify) <br />Test Method Used: <br />MR <br />Pressure ❑ Vacuum El Hydrostatic <br />Other (Specify) <br />Equipment Used: <br />Equipment Resolution: <br />k <br />Piping Run # 3 DIE DIE Piping Run # 2 SUP SUP Piping Run # 1 REG REG Piping Run # <br />Piping Material: <br />flexline flexline flexline <br />Piping Manufacturer: <br />C. S. C. S. C. S. <br />Piping Diameter: <br />211 21 211 <br />Length of Piping Run: <br />301 301 301 <br />Product Stored: <br />DIESEL REGULAR SUPREME <br />Method and location of <br />piping -run isolation: <br />sump sump sump <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5min 5min 5min <br />Test Start Time: <br />9:50 <br />Initial Reading (RI ): <br />5psi <br />Test End Time: <br />10:50 <br />Final Reading (RF ): <br />Opsi <br />Test Duration: <br />lhr <br />Change in Reading (RF - I I ): <br />5psi <br />Pass/Fail Threshold or 0 <br />Criteria: <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />reg and sup could not be tested due to bad boots in disp 1/2 and die secondary line <br />failed at boot in die stp sump. <br />
The URL can be used to link to this page
Your browser does not support the video tag.