Laserfiche WebLink
SWRCB, January 2002. <br />• Page 3. <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />❑X <br />El <br />Tank Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />Other (Specify) <br />Test Method Used: <br />MR <br />Pressure ❑ Vacuum El Hydrostatic <br />Other (Specify) <br />Equipment Used: <br />Equipment Resolution: <br />k <br />Piping Run # 3 DIE DIE Piping Run # 2 SUP SUP Piping Run # 1 REG REG Piping Run # <br />Piping Material: <br />flexline flexline flexline <br />Piping Manufacturer: <br />C. S. C. S. C. S. <br />Piping Diameter: <br />211 21 211 <br />Length of Piping Run: <br />301 301 301 <br />Product Stored: <br />DIESEL REGULAR SUPREME <br />Method and location of <br />piping -run isolation: <br />sump sump sump <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5min 5min 5min <br />Test Start Time: <br />9:50 <br />Initial Reading (RI ): <br />5psi <br />Test End Time: <br />10:50 <br />Final Reading (RF ): <br />Opsi <br />Test Duration: <br />lhr <br />Change in Reading (RF - I I ): <br />5psi <br />Pass/Fail Threshold or 0 <br />Criteria: <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />reg and sup could not be tested due to bad boots in disp 1/2 and die secondary line <br />failed at boot in die stp sump. <br />