Laserfiche WebLink
SWRCB, January 2002 Page 5. <br />6. PIPING SUMP TESTING <br />Test Method Developed By: <br />Sump Manufacturer Industry Standard Xl Professional Engineer <br />Other (Specify) <br />Test Method Used: <br />❑ <br />El <br />Pressure F Vacuum El Hydrostatic <br />Other (Specify) <br />Test Equipment Used: vplt <br />Sump # 3 DIE Sump # 1 REG <br />Equipment Resolution: inches <br />Sump # Sump # <br />Sump Diameter: <br />4811 <br />4 8 1 <br />Sump Depth: <br />6311 <br />56" <br />Sump Material: <br />fiberglass <br />fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Pentration: <br />2211 <br />24„ <br />Height from Tank Top to Lowest <br />Electrical Pentration: <br />3011 <br />25" <br />Condition of sump prior to testing: <br />good <br />good <br />Portion of Sump Tested: 1 <br />2411 <br />1411 <br />Does turbine shut down when <br />sump sensor detects liquid (both—]X <br />product and water)?* <br />]Yes ❑NOUN <br />Yes ❑No�N <br />Yes [:]N NA <br />Yes UNoa <br />Turbine shutdown response time: <br />2- 5 s e c <br />2- 5 s e c <br />Is system programmed for fail-safe <br />shutdown?* <br />Yes N N <br />❑ � <br />X Yes N N <br />U <br />Yes NOUN <br />❑ ^ <br />Yes No <br />[:]Yes❑ <br />Was fail-safe verified to be <br />operational?* <br />X ❑ Yes N N <br />U � <br />X ❑ Yes N N <br />❑ � <br />R ❑ Yes N N <br />❑ <br />X ❑ Yes No <br />❑ <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />5min <br />5min <br />Test Start Time: <br />9:50 <br />10 : 25 <br />Initial Reading (RI ): <br />0 <br />0 <br />Test End Time: <br />10 :2 0 <br />10:45 <br />Final Reading (RF ): <br />-.001511 <br />-.1985" <br />Test Duration: <br />3 Omin <br />2 Omin <br />Change in Reading (R F - Ri ): <br />-.001511 <br />-.1985" <br />Pass/Fail Threshold or Criteria: <br />-+ . 0 02 1t <br />-+.00211 <br />Was sensor removed for testing? I uYes NoUNA uYes N NA YesuNouNA uYes UNo <br />Was sensor properly replaced and � U � ❑ � � Yes ❑ <br />verified functional after testing? Ye N NA Ye N NA Ye N NA N <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO” or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />