Laserfiche WebLink
SWRCB, January 2002 <br />6. PIPING SUMP TESTING <br />Page 4 <br />Test Method Developed By: <br />F-1 <br />Sump Manufacturer ❑ Industry Standard ❑X Professional Engineer <br />Other (Specify) <br />Test Method Used: <br />Pressure ❑ Vacuum Hydrostatic <br />Other (Specify) <br />Test Equipment Used: vPlt <br />Sump # 1 REG Sump # 1 REG <br />Sump Diameter: 4811 4811 <br />Equipment Resolution: inches <br />Sump # 2 SUP Sump # 2 SUP <br />4811 4811 <br />Sump Depth: <br />56" <br />56" <br />59" <br />59" <br />Sump Material: <br />fiberglass <br />fiberglass <br />fiberglass <br />fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Pentration: <br />2411 <br />24" <br />2611 <br />26": <br />Height from Tank Top to Lowest <br />Electrical Pentration: <br />2511 <br />25" <br />2511 <br />25" <br />Condition of sump prior to testing: <br />good <br />good <br />good <br />good <br />Portion of Sump Tested: 1 <br />22 " <br />911 <br />2411 <br />15 " <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />Yes ❑N�N <br />Yes �N�N <br />Yes �N�N <br />E Yes ❑No�N <br />Turbine shutdown response time: <br />2 - 5sec <br />2 - 5sec <br />2 - 5sec <br />2 - 5 s e c <br />Is system programmed for fail-safe[:] <br />shutdown?* <br />X Yes N N <br />� <br />X ❑ ❑ Yes N N <br />� <br />X ❑ Yes MNo[_ <br />❑ `� <br />❑ X Yes ❑ No <br />Was fail-safe verified to be <br />operational?* <br />X Yes N N <br />❑ � <br />X Yes N N <br />❑ � <br />X Yes N N <br />❑ ❑ � <br />F7 -Yes ❑ aT <br />No <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />5min <br />5min <br />5min <br />5min <br />Test Start Time: <br />9: 50 <br />11:02 <br />10 :46 <br />11:02 <br />Initial Reading (Rl ): <br />0 <br />0 <br />0 <br />0 <br />Test End Time: <br />10 : 00 <br />11:32 <br />10:51 <br />11:32 <br />Final Reading (RF ): <br />-.1736 <br />-.0001 <br />-.0846 <br />-.0001 <br />Test Duration: <br />l Omin <br />3 Omin <br />3min <br />3 Omin <br />Change in Reading (R F - Rl ): <br />-.1736 <br />-.00O1 <br />-.0846 <br />-.0001 <br />Pass/Fail Threshold or Criteria: <br />-+.002" <br />-+.002" <br />-+.002" <br />-+.002" <br />Was sensor removed for testing? I UYesL_jNoLJNAjj X YesUNoUNA uYesuNouNA x Yes No <br />Was sensor properly replaced and c[:] NA❑ Ye� NNA❑ <br />YeNNA Yes N <br />verified fnctional after testing? ❑ Ye N X <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk(*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />