Laserfiche WebLink
12/2212009 15:12 20936515 TANKNOLOGY <br />Ift 0 <br />RCB 1 2002 <br />SW , , anuary <br />5. SECONDARY PIPE TESTING <br />Test -Method Developed By: x Tank Manufacturer industry Standard <br />Test Method Used <br />Test FAuipment Used: <br />Piping Material: <br />Piping Manufacturer: <br />Piping Diameter: <br />Length of Piping Run: <br />Product Stored: <br />Method and location of <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />Starting* test: <br />Test Start Time: <br />Initial Reading (Rt ); <br />Test End Time: <br />Final Reading (Rp ): <br />Test Duration: <br />Change in Reading (Rr, - Rt ) <br />Pass/Fail Threshold or <br />Other (Specify) <br />Pressure <br />Other (Sped) <br />Piping Run It 3 DYE <br />f 1eacXin <br />c.s <br />211 <br />30' <br />DIESEL <br />sump <br />5min <br />9:50 <br />5psi <br />10:50 <br />apsi <br />1h <br />5psi <br />0 <br />5mi.n <br />an r�ecommen e <br />5min <br />PAGE 03/06 <br />Page 3 . <br />Rue # <br />information on repairs made prior to testing, tests) <br />re and sup could not be tested due to bad boots in dis 1/2 and die sea ndary line <br />failed at boot in die stv Sum , <br />I <br />Engineer <br />aVacuum <br />Equipment Resolution: <br />DIX <br />Piping Ran fl 2 SUP SUP Piping Ran H 1 REG RFO <br />e <br />flexline <br />flexli.ne <br />c.s. <br />a. S. <br />2' <br />211 <br />30' <br />30' <br />REGUt AR <br />SUPREME <br />sump <br />sump <br />9:50 <br />5psi <br />10:50 <br />apsi <br />1h <br />5psi <br />0 <br />5mi.n <br />an r�ecommen e <br />5min <br />PAGE 03/06 <br />Page 3 . <br />Rue # <br />information on repairs made prior to testing, tests) <br />re and sup could not be tested due to bad boots in dis 1/2 and die sea ndary line <br />failed at boot in die stv Sum , <br />I <br />Engineer <br />