My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
15
>
2300 - Underground Storage Tank Program
>
PR0231404
>
COMPLIANCE INFO_2003-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2021 1:21:27 PM
Creation date
6/23/2020 6:46:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2004
RECORD_ID
PR0231404
PE
2361
FACILITY_ID
FA0002915
FACILITY_NAME
TRACY MARKET INC
STREET_NUMBER
15
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21435004
CURRENT_STATUS
01
SITE_LOCATION
15 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231404_15 E GRANT LINE_2003-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
363
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPILL CONTAINER CONTAINMENT TESTING <br />Test Method By: <br />Test Method Uses: <br />Measuring Equipment Used: <br />Manufacturer • Industry Standard <br />Pressure Vacuum <br />Level Change Indicator <br />Professional Engr. Other (see below) <br />• Hydrostatic Other (see below) <br />(Caldwell System 2001 ! Walton Engineering) <br />Description <br />Tank #1 <br />Tank #2 <br />Tank #3 <br />Spill container manufacturer <br />OPW <br />OPW <br />OPW <br />0:05 <br />0:04 <br />Spill container capacity (US gallons) <br />5 Gallons <br />5 Gallons <br />5 Gallons <br />12.75 <br />Test start time <br />Spill container depth {inches} <br />13.00 <br />15.00 <br />13.00 <br />10:25 AM <br />10:30 AM <br />Product contained <br />Gasoline - 87 <br />Gasoline - 87 Siphon <br />Gasoline - 91 <br />0:30 <br />Change in water level (t 0.000 inches) <br />Is Spill container located in a sump? <br />Yes <br />Yes <br />Yes <br />0.005 <br />0.005 <br />Does sump have a liquid sensor installed? <br />Yes <br />Yes <br />Yes <br />PASS <br />Distance between fill adapter and <br />vapor adapter <br />15' <br />16" <br />16" <br />Condition of spill container prior to testing <br />Comments: <br />Dry <br />Dry <br />Dry <br />Portion of spill container tested <br />Entire <br />Entire <br />Entire <br />Wait time for water level to stabilize (hrmin) <br />0:05 <br />0:04 <br />0:05 <br />Depth of water level from bottom (inches) <br />12.75 <br />14.75 <br />12.75 <br />Test start time <br />9:55 AM <br />10:00 AM <br />10:05 AM <br />centers inches <br />10:25 AM <br />10:30 AM <br />10:35 AM <br />Condition of spill container prior to testing <br />Comments: <br />Dry <br />Dry <br />Dry <br />Portion of spill container tested <br />Entire <br />Entire <br />Entire <br />Wait time for water level to stabilize (hrmin) <br />0:05 <br />0:04 <br />0:05 <br />Depth of water level from bottom (inches) <br />12.75 <br />14.75 <br />12.75 <br />Test start time <br />9:55 AM <br />10:00 AM <br />10:05 AM <br />Test end time <br />10:25 AM <br />10:30 AM <br />10:35 AM <br />Test duration (hr:min) <br />0:30 <br />0:30 <br />0:30 <br />Change in water level (t 0.000 inches) <br />0.000 <br />0.000 <br />0.000 <br />Pass/Fail threshold (0.005 inches / % Hr.) <br />0.005 <br />0.005 <br />0.005 <br />TEST RESULT <br />PASS <br />PASS <br />PASS <br />© 2003 Wagon Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.