My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
15
>
2300 - Underground Storage Tank Program
>
PR0231404
>
COMPLIANCE INFO_2005-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2021 1:58:57 PM
Creation date
6/23/2020 6:47:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2009
RECORD_ID
PR0231404
PE
2361
FACILITY_ID
FA0002915
FACILITY_NAME
TRACY MARKET INC
STREET_NUMBER
15
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21435004
CURRENT_STATUS
01
SITE_LOCATION
15 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\15\PR0231404\STIPULATION FOR FINAL JUDGMENT 12-2-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
409
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. 3 - <br /> 5. CALIBRATION REQUIP EMEITS <br /> 5.1 All flow measuring devices shall be bench tested for y using a <br /> reference gauge or NIST traceable standard at least once evaccuracery <br /> consecutive days. Accuracy checks shall be Performed at a in <br /> 180 um <br /> five (5) Points (e.g., 10, 25, 50, 75 and go percent of full scale). of <br /> y of <br /> the most current accuracy check Of the ROW meter shall be kept with the <br /> equipment. <br /> 5.2 Information on the calibration check gas and inlet test gas shall be entered <br /> into a log identifying each cylinder by serial number. Documentation of <br /> certification shall be maintained With the as cylinders at all times and <br /> shall also be attached to Form 1. The Gaglibration check gas log shall be <br /> maintained with the gas cylinders at all times and made readily available <br /> to the district upon request. Sufficient information shall be maintained to <br /> allow a determination of the certification status of each calibration gas and <br /> shall include: (1) the date Put in service, (2) assay result, (3) thson <br /> tes the <br /> assay was performed, and (4) the organization and specific Penel who <br /> performed the assay, <br /> 6, PRE-TEST REQUIREMENTS <br /> 6.1 Follow the HC analyzer manufacturer's procedure for instrument start-up <br /> and warm-up, <br /> 6.2 Check the zero reading of the HC analyzer using Bs greater than 0.1% by volume (I000 g ambient air. If the result <br /> the manufacture's PPM) trecommended Procedures,hen re-zero the analyzer per <br /> Record results on Form I <br /> 6.3 Check the calibration of the HC analyzer by prohced <br /> .9calibration check gas following the manufacturer's eures.by volume The <br /> reading must be between a8% and 1.0% by volume. Record results on <br /> Form 1. If the result is Outside of the required range then the analyzer <br /> shall be recalibrated per manufacturers <br /> this test, specifications prior to conducting <br /> 6.4 Assemble the inlet test gas cylinder, regulator flow meter and flow control <br /> valve, and transfer line as shown in Figure <br /> sampling line to the outlet test port 1. Attach the HC analyzer <br /> Polisher as shown in Figure 1. / inch NPT fitting on the top of the <br /> 6.5 Visually check to ensure the inlet 3-way valve (see Figura. <br /> Polisher is in the closed test Position so the flow is coming 1) to the Va or <br /> test gas to the inlet of the Vapor Polisher. from the inlet <br /> VST Phase It EVR System, Exhibit 12-VR-203-E and VR-204-E <br />
The URL can be used to link to this page
Your browser does not support the video tag.