My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
15
>
2300 - Underground Storage Tank Program
>
PR0231404
>
COMPLIANCE INFO_2005-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2021 1:58:57 PM
Creation date
6/23/2020 6:47:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2009
RECORD_ID
PR0231404
PE
2361
FACILITY_ID
FA0002915
FACILITY_NAME
TRACY MARKET INC
STREET_NUMBER
15
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21435004
CURRENT_STATUS
01
SITE_LOCATION
15 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\15\PR0231404\STIPULATION FOR FINAL JUDGMENT 12-2-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
409
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br /> COax-1-2-1 Hoses <br /> or dispenser, as appropriate. e 'Se <br /> exceed fifteen feet as measured from the base of the nozzle to the end of disp n r <br /> I. The maximum leogth Of the curb hose, breakaway, and whip hose combined shall not <br /> adapter <br /> 2. The liquid removal rate shall not be less than five milliliters per gallon (5 mi/gal) as <br /> determined by Exhibit 5 when tested with a gasoline flow rate between six (60) <br /> and ten (10-0) gallons per minute. Liquid removal requirement is applicable to all <br /> grade Of gasoline. <br /> 3, Any hose configuration is allowed when installed in accordance with IOM <br /> mqkasection 12. <br /> A ��� <br /> 1. <br /> The VST breakaway couplings are non-reconnecting and shall be replaced following a <br /> d.rive-off. If reusing hanging hardware Other than the breakaway following a drive-off, <br /> hardware Prior to returning the fueling Point to operation, The Procedure for testing the <br /> testing is required to ensure Proper operation and no observed leaks of the hanging <br /> hanging hardware following a drive-off is referenced in the IOM section titled "Drive-offs <br /> and Other Customer Abuse." <br /> Flow Limiter <br /> 1. No flow limiter is allowed for this system, <br /> I/ST =Cs b <br /> 1• The Processor vapor integrity shall demonstrate compliance with the static pressure decay <br /> criteria of TP-201.3 and Exhibit 4. <br /> 2. Unless there is maintenance or testing being conducted on theProcessor, the processor <br /> shall be on and in the automatic vapor Processor mode and the three ball valves shall Thee locked in the open Positions shown in Figure 2B-2 for n <br /> handles of the ball valves shall not be removed. ormal processor operation. <br /> 3- Piping to and from the Processor shall be sloped 1/8"Per foot minimum toward the vent <br /> line(s). <br /> 4. The hydrocarbon concentration of the ECS Membrane Processor taken <br /> Hydrocarbon Diagnostic Report shall be between ± one Percent (t1% <br /> ), whfrom the <br /> en tested in <br /> accordance with Exhibit 6. <br /> 5, The Vapor Pressure Sensor shall be between +0.2 and—0.2 inche-,WC when tested in <br /> accordance with section 9 Of Exhibit 8. <br /> VST Phase It EVP System, Exhibit 2 -VR-203-E <br />
The URL can be used to link to this page
Your browser does not support the video tag.