Laserfiche WebLink
0 <br /> ecPage 3 of 9 o <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specifi) <br /> Test Method Used: ® Pressure ❑ Vacuum ❑Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used`. Pressure Gauge Equipment Resolution: 0-30 psi <br /> OEM� Piping Run#87 Piping Run#87 SYP Piping Run#91 Piping Run#87 <br /> Vent <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: AO Smith AO Smith AO Smith AO Smith <br /> Piping Diameter: 3 in 3 in 3 in 3 in <br /> Length of Piping Run: 68 feet 7 feet 67 feet 70 feet <br /> Product Stored: Gasoline Gasoline Gasoline Vapor <br /> Method and location of 87 Sump - 87 Sump - 87 SYP 91 Sump - 87 Sump-Vent <br /> piping-run isolation: Dispensers Sump Dispensers <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 1:15 PM 1:15 PM 1:15 PM 1:15 PM <br /> Initial Reading(Rj): 5 psi 5 psi 5 psi 5 psi <br /> Test End Time: 2:15 PM 2:15 PM 2:15 PM 2:15 PM <br /> Final Reading(RF): 5 psi 5 psi 5 psi 5 psi <br /> Test Duration: 60 min 60 min 60 min 60 min <br /> Change in Reading(RF-R,): 0 0 0 0 <br /> Pass/Fail Threshold or 5 psi 5 psi 5 psi 5 psi <br /> Criteria: <br /> Test Result: Z Pass ❑ Fail ® Pass ❑ Fail 0 Pass ❑ Fail ® Pass ❑ Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> APR 2 5 2012 <br /> .,I�� ^ ;�aI.J:: <br />