My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
15
>
2300 - Underground Storage Tank Program
>
PR0231404
>
COMPLIANCE INFO_2009-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2021 3:00:37 PM
Creation date
6/23/2020 6:47:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2018
RECORD_ID
PR0231404
PE
2361
FACILITY_ID
FA0002915
FACILITY_NAME
TRACY MARKET INC
STREET_NUMBER
15
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21435004
CURRENT_STATUS
01
SITE_LOCATION
15 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\15\PR0231404\PERMANENT INJUNCTION & FINAL JUDGMENT 1-15-10.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> ecPage 3 of 9 o <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specifi) <br /> Test Method Used: ® Pressure ❑ Vacuum ❑Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used`. Pressure Gauge Equipment Resolution: 0-30 psi <br /> OEM� Piping Run#87 Piping Run#87 SYP Piping Run#91 Piping Run#87 <br /> Vent <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: AO Smith AO Smith AO Smith AO Smith <br /> Piping Diameter: 3 in 3 in 3 in 3 in <br /> Length of Piping Run: 68 feet 7 feet 67 feet 70 feet <br /> Product Stored: Gasoline Gasoline Gasoline Vapor <br /> Method and location of 87 Sump - 87 Sump - 87 SYP 91 Sump - 87 Sump-Vent <br /> piping-run isolation: Dispensers Sump Dispensers <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 1:15 PM 1:15 PM 1:15 PM 1:15 PM <br /> Initial Reading(Rj): 5 psi 5 psi 5 psi 5 psi <br /> Test End Time: 2:15 PM 2:15 PM 2:15 PM 2:15 PM <br /> Final Reading(RF): 5 psi 5 psi 5 psi 5 psi <br /> Test Duration: 60 min 60 min 60 min 60 min <br /> Change in Reading(RF-R,): 0 0 0 0 <br /> Pass/Fail Threshold or 5 psi 5 psi 5 psi 5 psi <br /> Criteria: <br /> Test Result: Z Pass ❑ Fail ® Pass ❑ Fail 0 Pass ❑ Fail ® Pass ❑ Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> APR 2 5 2012 <br /> .,I�� ^ ;�aI.J:: <br />
The URL can be used to link to this page
Your browser does not support the video tag.