Laserfiche WebLink
e c lo, <br /> Page 4 of 9 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other(Spew) <br /> Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Spew) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0-30 psi <br /> Piping Rutz#87 SYP Piping Run#91 Piping Run#Vapor <br /> Vent Vent Return Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: AO Smith AO Smith AO Smith <br /> Piping Diameter: 3 in 3 in 3 in <br /> Length of Piping Run: 60 feet 50 feet 127 feet <br /> Product Stored: Vapor Vapor Vapor <br /> Method and location of Sumps - <br /> piping-run isolation: 87 SYP Sump -Vent 91 Sump -Vent <br /> Dispensers <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 1:15 PM 1:15 PM 1:15 PM <br /> Initial Reading(Rj): 5 psi 5 psi 5 psi <br /> Test End Time: 2:15 PM 2:15 PM 2:15 PM <br /> Final Reading(RF): 5 psi 5 psi 5 psi <br /> Test Duration: 60 min 60 min 60 min <br /> Change in Reading(RF-Rj): 0 0 0 <br /> Pass/Fail Threshold or 5 psi 5 psi 5 psi <br /> Criteria: <br /> 'fest Result: ® Pass ❑ Fail ® Pass ❑ Fail E Pass ❑ Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ADD 2 5 tFttt <br />