Laserfiche WebLink
I <br />v/ <br />Page 2 of 9 <br />Test Method Developed By: ❑ Tank Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ® Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Vacuum Gauge <br />10 min <br />Equipment Resolution: 0-30 Hg <br />10 min <br />Test Start Time: <br />10:25 AM <br />9:50 AM <br />10:00 AM <br />Tank #87 <br />Tank # 87 Syphone <br />Tank # 91 <br />Tank # <br />Is Tank Exempt From Testing?' <br />❑ Yes ® No <br />❑ Yes ® No <br />❑ Yes ® No <br />❑ Yes ❑ No <br />Tank Capacity: <br />12000 Gal <br />12000 Gal <br />12000 Gal <br />7 Hg <br />Tank Material: <br />D/W Steel <br />DMI Steel <br />DMI Steel <br />60 min <br />Tank Manufacturer: <br />Unknown <br />Unknown <br />Unknown <br />0 <br />Product Stored: <br />Unleaded 87 <br />Unleaded 87 <br />Unleaded 91 <br />7 Hg <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 min <br />10 min <br />10 min <br />Test Start Time: <br />10:25 AM <br />9:50 AM <br />10:00 AM <br />Initial Reading (Rj): <br />7Hg <br />7Hg <br />7Hg <br />Test End Time: <br />11:25 AM <br />10:50 AM <br />11:00 AM <br />Final Reading (RF): <br />7 Hg <br />7 Hg <br />7 Hg <br />Test Duration: <br />60 min <br />60 min <br />60 min <br />Change in Reading (RF-Rj): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />7 Hg <br />7 Hg <br />7 Hg <br />Test Result: <br />® Pass ❑ Fail <br />0 Pass ❑ Fail <br />® Pass El Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? <br />®Yes [—]No [:INA <br />®Yes ❑No ❑NA <br />®Yes ❑No ❑NA <br />❑Yes ❑No ❑NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />®Yes ❑No [-INA <br />®Yes ❑No ❑NA <br />®Yes ❑No ❑NA <br />❑Yes ❑No ❑NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br />containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment <br />testing. {California Code of Regulations, Title 23, Section 2637(a)(6)} <br />