Laserfiche WebLink
I 1 0 0 e c o,,/' <br />Page 3 of 9 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specifv) <br />Test Equipment Used: Pressure Gauge <br />Equipment Resolution: 0-30 psi <br />i=- <br />Piping Run # 87 <br />� <br />Piping Run # 87 SYP <br />Piping Run # 91 <br />Piping Run # 87 <br />Vent <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />AO Smith <br />AO Smith <br />AO Smith <br />AO Smith <br />Piping Diameter: <br />3 in <br />3 in <br />3 in <br />3 in <br />Length of Piping Run: <br />68 feet <br />7 feet <br />67 feet <br />70 feet <br />Product Stored: <br />Gasoline <br />Gasoline <br />Gasoline <br />Vapor <br />Method and location of <br />piping -run isolation: <br />87 Sump - <br />Dispensers <br />87 Sump - 87 SYP <br />Sump <br />91 Sump - <br />Dispensers <br />87 Sump - Vent <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5 min <br />5 min <br />5 min <br />5 min <br />Test Start Time: <br />10:35 AM <br />10:35 AM <br />10:35 AM <br />10:35 AM <br />Initial Reading (Rj): <br />5 psi <br />5 psi <br />5 psi <br />5 psi <br />Test End Time: <br />11:35 AM <br />11:35 AM <br />11:35 AM <br />11:35 AM <br />Final Reading (RF): <br />5 psi <br />5 psi <br />5 psi <br />5 psi <br />Test Duration: <br />60 min <br />60 min <br />60 min <br />60 min <br />Change in Reading (RF-Ri): <br />0 <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />5 psi <br />5 psi <br />5 psi <br />5 psi <br />Test Result: '' <br />®,Pass ❑ Fail <br />® Pass `" ❑ Fail <br />Z Pass ❑ Fail <br />® Pass ❑'Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />