My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1153
>
2300 - Underground Storage Tank Program
>
PR0231413
>
COMPLIANCE INFO_2012-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 2:19:25 PM
Creation date
6/23/2020 6:47:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2016
RECORD_ID
PR0231413
PE
2361
FACILITY_ID
FA0003122
FACILITY_NAME
QUIK STOP MARKET #3138
STREET_NUMBER
1153
STREET_NAME
LINCOLN
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
231-190-12
CURRENT_STATUS
01
SITE_LOCATION
1153 LINCOLN BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231413_1153 LINCOLN_2012-2016.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TANK ANNULAR TESTINGY, <br /> Test Method By • Manufacturer O Industry Standard O Professional Engr. O Other(see below) <br /> Test Method Uses: o Pressure ® Vacuum o Hydrostatic o Other(see below)' <br /> Measuring Equipment Used: Vacuum Gauge (range 0 to 30 inches Hg) <br /> Description Tank#1 Tank#2 Tank#3 <br /> Product stored Gasoline-87 Gasoline-89 Gasoline-91 <br /> Tank manufacturer Unknown Unknown Unknown <br /> Tank material FRP FRP FRP <br /> Tank capacity (US gallons) 10,000 10,000 8,000 <br /> Is this a multi-compartment tank? No No No <br /> Dry or Brine filled annular? Dry Dry Dry <br /> Monitoring system show normal annular? Yes Yes Yes <br /> Is water table above tank bottom? Unknown Unknown Unknown <br /> Was sensor removed for testing? No No No <br /> Was sensor properly replaced after testing? N/A N/A N/A <br /> Wait time for vacuum to stabilize (hr:min) 0:10 0:10 0:10 <br /> Test start time 11:11 AM 11:11 AM 11:11 AM <br /> Initial vacuum (inches Hg) 10.0 10.0 10.0 <br /> Test end time 1:11 PM 1:11 PM 1:11 PM <br /> Final vacuum (inches Hg) 10.0 10.0 10.0 <br /> Test duration (hr.min) 2:00 2:00 2:00 <br /> Change in vacuum (inches Hg) 0.0 0.0 0.0 <br /> Pass/Fail threshold (inches Hg/hour) 2.0 2.0 2.0 <br /> TEST RESULT PASS PASS PASS <br /> Comments: <br /> Tanks 1,2,3 are manifolded together with one vent risor. <br /> The gauge on tank#1 was used to record the results. <br /> 0 2016 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.