My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1153
>
2300 - Underground Storage Tank Program
>
PR0231413
>
COMPLIANCE INFO_2012-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 2:19:25 PM
Creation date
6/23/2020 6:47:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2016
RECORD_ID
PR0231413
PE
2361
FACILITY_ID
FA0003122
FACILITY_NAME
QUIK STOP MARKET #3138
STREET_NUMBER
1153
STREET_NAME
LINCOLN
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
231-190-12
CURRENT_STATUS
01
SITE_LOCATION
1153 LINCOLN BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231413_1153 LINCOLN_2012-2016.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL <br /> SECONDARY LINE TESTING <br /> Test Method By 0 Manufacturer • Industry Standard o Professional Engr o Other(see below)' <br /> Test Method Uses: • Pressure o vacuum o Hydrostatic o Other(see below) <br /> Measuring Equipment Used: Pressure Gauge (range 0 to 15 psig) <br /> DescriptionLine#1 Line#2 Line#3 <br /> Tank product Gasoline-87 Gasoline-89 Gasoline-91 <br /> Pipe manufacturer Smith Smith Smith <br /> Pipe material FRP FRP FRP <br /> Primary pipe diameter (inches) 2 2 2 <br /> Secondary pipe diameter (inches) 3 3 3 <br /> Method of secondary pipe isolation Boot Boot Boot <br /> Location of secondary pipe isolation Sump Sump Sump <br /> Estimated length of piping run (feet) 80 80 80 <br /> (include length of branch runs) <br /> Wait time for pressure to stabilize (hr:min) 0:10 0:10 0:10 <br /> Test start time 10:30 AM 9:28 AM 1:50 PM <br /> Initial pressure (psig) 5.0 5.0 5.0 <br /> Test end time 11:30 AM 10:28 AM 2:50 PM <br /> Final pressure(psig) 5.0 5.0 5.0 <br /> Test duration (hr:min) 1:00 1:00 1:00 <br /> Change in pressure (psig) 0.0 0.0 0.0 <br /> Pass/Fail threshold (psig) 0.5 0.5 0.5 <br /> TEST RESULT PASS PASS PASS <br /> Comments: <br /> © 2016 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.