Laserfiche WebLink
Cc: Sam Alkoussa; Cesar Bosano; De ah Markovich; veronica.f@waltonengineering.com; Kevin Hess <br /> Subject: RE: <br /> Thank you very much, I have received the documents and have reviewed them I was able to close out violation#121, <br /> #201 and#209. <br /> Iem #211: Walton Engineering has completed the D.O. training for all employees (see attached). I found attached to <br /> the email page 2 of the training log however the violation was written because hire dates on the training log <br /> were missing (which was corrected) and page one of the training was not on site. I did not see page one of the <br /> document, Would you please send me a copy of page one of the training log. <br /> Violation # Item #104: The tank information has been corrected in CERS, and Item #107: The piping layout map is <br /> been prepared by Walton Engineering. Upon receipt it will be included in the Monitoring Plan and submitted in CERS. I <br /> have been instructed by my supervisors to not close the violations until the CERS submittal is accepted, which cannot be <br /> accepted if the pipe layout is not uploaded. Once the pipe layout is added and the CERS submittal is accepted, I will close <br /> both violations. <br /> Item #315: Quik Stop Markets will schedule the removal of liquid in the 87, 89, and 91 product fill sumps and dispose of <br /> the liquids properly. The manifests will be sent to you upon receipt from the contractor. Once you submit the disposal <br /> record or the work order for the removal of the liquid I will close this violation. <br /> If you have any questions please do not hesitate to give me a call at 209-953-7311. <br /> Best regards, <br /> Iuna Barker Portillo <br /> Environmental Health Specialist <br /> San Joaquin County En-6ronmental Health Department <br /> 1868 E Hazelton Ave <br /> Stockton, CA 95205 <br /> Tel (209)953-7311 <br /> From: Roger Batra <Roger.Batra@quikstop.com> <br /> Sent:Thursday,August 9, 2018 12:01 PM <br /> To: EH-UST<ust@sjcehd.com>;Zuna J. Barker [EH] <zbarker@sjcehd.com>; Garrett Backus [EH] <gbackus@sjcehd.com> <br /> Cc:Sam Alkoussa <Sam.Alkoussa@quikstop.com>; Cesar Bosano<Cesar.Bosano@quikstop.com>; Deborah Markovich <br /> <Deborah.Markovich@quikstop.com>;veronica.f@waltonengineering.com; Kevin Hess<Kevin.Hess@kwikshop.com> <br /> Subject: FW: <br /> Zuna, <br /> In response to the UST Program Inspection Report dated August 7, 2018, the following actions were taken: <br /> Item #104: The tank information has been corrected in CERS. <br /> Item #107: The piping layout map is been prepared by Walton Engineering. Upon receipt it will be included <br /> in the Monitoring Plan and submitted in CERS. <br /> Item #121: No response required. <br /> 2 <br />