Laserfiche WebLink
0 0 <br /> Iem #201: The financial responsibility documents were submitted in CERS. A copy has been placed in Tab 6 of the Blue <br /> UST Volume I Binder at the facility. <br /> Item #209: Walton Engineering (Designated Operator) has been instructed to ensure that all testing and maintenance <br /> dates are entered correctly. <br /> Iem #211: Walton Engineering has completed the D.O. training for all employees (see attached). <br /> Item #308: Corrected at the time of inspection. <br /> Item #315: Quik Stop Markets will schedule the removal of liquid in the 87, 89, and 91 product fill sumps and dispose of <br /> the liquids properly. The manifests will be sent to you upon receipt from the contractor. <br /> Item #318: Corrected at the time of inspection. <br /> The Return to Compliance certification is signed and dated. <br /> Thanks, <br /> Roger Batra <br /> Director of Environmental Affairs <br /> 510-445-2285 <br /> PLEASE FORWARD TO ZUNA BARKER <br /> Roger Batra <br /> C-Store/DIR Fuel Compliance <br /> E: Roger.Batra@quikstop.com <br /> Quik Stop Markets Inc <br /> 4567 Enterprise Street <br /> Fremont ( CA 194538 <br /> Qui kStopâ–ş <br /> EG America <br /> From: Zuna J. Barker [EH] [zbarker@sjcehd.com] <br /> Sent: Tuesday, August 07, 2018 1:59 PM <br /> To: nicostratosl3@gmail.com <br /> Cc: Roger Batra <br /> Subject: <br /> Please find attached to this email the inspection report for the underground storage tank inspection conducted today. <br /> If you have any questions do not hesitate to contact me at 209-953-7311. <br /> Best regards, <br /> Zuna Barker <br /> 3 <br />