My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_2012-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 3:36:41 PM
Creation date
6/23/2020 6:47:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2017
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
217-021-04
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231425_430 W CENTER_2012-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 6 <br />0 0 <br />penetrations inside the UST sump with standard schedule 80 pipe and <br />painting them with a non corrosive material. We will insert the schedule <br />80 pipe into the sump penetration and tighten the existing clamps to <br />ensure the water tightness of the sump. <br />2. I see that the drawings show this as "new fuel pipe vault" but it is an <br />existing above ground raceway that is visually inspected once a month. <br />We will be re-routing the pipe from the existing indoor daytank that will <br />be removed to the new weather proof day tank that will be installed. We <br />will be placing a metal cover over the piping in case of rain. <br />3. There will not be a "new fuel pipe vault". We will be manufacturing a <br />metal cover over the piping that will be fabricated in the field. It is above <br />ground piping and will be visually inspected once a month. <br />4. I will re fill out page 5 of the application. We will not be breaking out <br />any concrete because these are flex lines and will be removed from the <br />4" raceway. <br />5. There will not be an analytical lab because no sampling will be <br />required as far as I know. <br />6. We will be hiring an environmental cleaning company that will rinse <br />and certify clean prior to removing and disposing of any material from <br />the site. <br />7. Please see attached screen shot of the ICC certification for the tank <br />work. <br />Please call me to discuss these items should you have a problem with <br />any of them. <br />Thank You, <br />Mark Crisp <br />P.C. Inc. <br />0: 800-359-2747 <br />C.• 805-441-1963 <br />From: Elena K. Manzo [EH] <emanzo@sjcehd.com> <br />To: 'mark crisp' <mark@pc-inc.net> <br />Sent: Friday, May 8, 2015 9:46 AM <br />Subject: RE: 430 W Center Street, Manteca, CA, <br />Dear Mark, <br />Attached please find my comments to your permit application for the <br />above referenced facility. Please don't hesitate to call me if you have any <br />questions. <br />Sincerely, <br />Elena K. Manzo, REHS <br />San Joaquin County <br />Environmental Health Department <br />1868 E. Hazelton Ave. <br />Stockton, CA 95205-6232 <br />Voice: (209) 953-7699 <br />7/6/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.