Laserfiche WebLink
40 0 Page 1 of 4 <br />Elena K. Manzo [EH] <br />From: <br />mark crisp [mark@pc-inc.net] <br />Sent: <br />Friday, June 12, 2015 9:16 AM <br />To: <br />Elena K. Manzo [EH] <br />Cc: <br />Garrett Backus [EH] <br />Subject: <br />Re: 430 W Center Street, Manteca, CA, <br />Attachments: VERIZON - MANTECA C.O. Generator A -P -E Revision 060515.pdf; Revised permit <br />application.pdf; transition Pic.png; ICC.jpg <br />Elena, Please find attached the revised application, revised drawings and the ICC certs. The "existing <br />above ground raceway" penetration pictures are attached as well. There is not a product number on them <br />but they are piping transition boots that are water tight. Please review and let me know if anything else is <br />required <br />Thank You, <br />Mark Crisp <br />P.C. Inc. <br />O: 800-359-2747 <br />C: 805-441-1963 <br />TA <br />Tt <br />ENV <br />i q d `w. .� p" <br />From: Elena K. Manzo [EH] <emanzo@sjcehd.com> <br />To: 'mark crisp' <mark@pc-inc.net> <br />Cc: Garrett Backus [EH] <gbackus@sjcehd.com> <br />Sent: Wednesday, May 20, 2015 4:43 PM <br />Subject: RE: 430 W Center Street, Manteca, CA, <br />Dear Mark, <br />I am still in the process of reviewing your response and I may have further questions, but meanwhile, to <br />speed up the process, please provide the following information: <br />1) Fill out and provide the requested/missing permit application pages, please refer to my <br />letter dated May 8, 2015. <br />2) Revise your scope of work to reflect all the proposed work (including the proposed pipe <br />removal and penetration abandonment procedure, including the type of "non corrosive <br />material" you are going to apply to the schedule 80 pipe"). Also, please provide a statement <br />from the manufacturer of existing tank top sump penetration(s) (this pertains to the flex line <br />that will be removed) that the proposed "plugging" method is approved with their penetration <br />product. Provide a site map that will correspond to your proposed scope of work, identifying <br />the line to be abandoned, etc. <br />3) Although you don't plan to break out concrete, we will be requiring confirmation <br />sampling below the removed piping, so please fill out the appropriate permit application <br />pages and explain how you will collect the necessary soil samples. <br />4) Please verify that appropriate product line penetrations are installed inside the "existing <br />above ground raceway". It's is my understanding that the underground product piping <br />transitions to above ground inside this vault. <br />Please don't hesitate to call or email me if you have any questions. <br />Sincerely, <br />Elena K. Manzo, REHS <br />San Joaquin County <br />6/12/2015 <br />