Laserfiche WebLink
DAY TANK SPECIFICATION <br />FUEL OIL GENERAL NOTES <br />FUEL OIL LEGEND <br />SPECIFICATION FOR UL -142 DOUBLE-WALL SECONDARY CONTNNMENT <br />SECONDARY CONTAINMENT EMERGENCY VENT PORTS (100 <br />1.5.8 RELAY DRY CONTACT OUTPUTS FOR THE FOLLOWING <br />I. THE LOCATIONS SHOWN OF THE EXISTING DESEL FUEL OIL LINES <br />SYMBOL ABBREV. <br />IDENTIFICATION <br />V� <br />CONSTRUCTION DAY TANK WITH ON -BOARD SUPPLY DUPLEX PUMPS <br />GALLON AND LARGER). <br />(5ASPDT): <br />ARE APPROXIMATE AND ARE TO IDENTIFY POINTS OF CONNECTIONS <br />6 E^ <br />DRAWING FROM A REMOTE MAIN SOURCE TANK AND ON -BOARD <br />1.3.3.3 ?HE TANK SHAL BE EQUIPPED WITH A WELDED STEEL <br />LOW aiRMS <br />FOR NEW PRODUCT LINES OR FOR COORDINATOR OF CLEARANCES <br />BETWEEN EXISTING AND NEW PIPING. INDICATION Of EXISTING <br />-(E)(X-OR <br />(F)XX <br />EIItStNK P�N6 OR EWWMCNI i0 Pdw.& <br />DUPLEX RETURN PUMPS RETURNING OVERFLOW TO A REMOTE MaN <br />SOURCE TANK. <br />CHANNEL BASE SUITABLE FOR BUT ATTACHMENT TO A <br />CONCRETE PAD <br />HIGH ALARMS <br />PIPING SHALL NOT BE CONSIDERED AS AN EXACT LOCATION OR A <br />xu(E)Xx-ORS (E)XX <br />DUSTWG PORING OR FGDPMENT TO BE DFAUSHM <br />§X <br />THE FOLLOWING OEFMES A DAY TANK W9TH A DUPLEX PUMP SYSTEM <br />13,3,4 THE TANK SHALL HAVE INTERIOR CORROSION INH89OR TO <br />LW <br />COMPLETE SURVEY OF EXISTING INSTALLATION. <br />OR <br />NEW PIPING OR EQUIPMENT <br />OSICNED FOR DELIVERY OF FUEL FROM A SOURCE STORAGE TANK TO <br />DETER CORROSION PRIOR TO INSTALLATION AND USE <br />NOT IN AUTO <br />AR <br />2. THESE DRAWINGS E CMGRAMNAIIC. THE CONTRACTOR SMALL <br />£ <br />A DAY INK. APPROXIMATELY 200 -FEEL HORIZONTAL AND WITHIN <br />1335 THE EXTERIOR OF THE DAY TANK SHALL RECEIVE A <br />ASSUME FULL RESPONSIBILITY OF COORDINATION WITH VARIOUS <br />-FOS- <br />FOS <br />NEI. SUPPLY PIPING <br />V <br />18 -FEET OF VERTICAL UP FROM THE LDIVEST POINT VN A PUMP SET <br />HLAVY-DUTY INDUSTRIA AMI -CORROSION COATING AND DE <br />TRADES ANO INCLUDE TURNS, BENDS, ADDITIONAL LENGTHS OF <br />-FOR- <br />FOR <br />FUEL RETURN PIPING <br />b a <br />INSTALLED ON ME WAY TANK. AT TNS STE, CONSIDERATKkR MUST BE <br />OLIVER TO SUCTION LFT CHARACTERISTICS OF PUMPS: THIS SYSTEM <br />FINISH PAINTED <br />1,331 ALL DAY TANK SYSTEM COMPONENTS SHALL BE PROTECTED <br />t b DAY TANK TESTING <br />1.6 W DAY TANK SHALL BE SUPPLED WITH MANUFACTURERS <br />PIPING AND ELEVATION CHANGES, AND TRANSITIONS WITHOUT <br />ADDITIONAL COST TO THE OWNER, <br />FM FOV <br />FUEL OIL VENT PIPING <br />®S <br />WILL OPERATE IN TME SUCTION OR EAPABLUTY CURVE OF THE <br />BY A REMOVABLE OR HINGED STEEL EQUIPMENT COVER. <br />.1 <br />TEST CERTIFICATES AS BELOW TANK TESTS: PRESSURE TEST, <br />p <br />PUMPS. THEREFORE, PIPE SIZE OF BOTH SUPPLY AND RETURN LINES <br />AND <br />1 3,37 DAY TANK SHALL BC FACTORY LEAK TESTED AT 3P51. <br />LUN( PROOF TEST AND STR'CTURAL INTEGFttY/ PPERMCE <br />LOCATION AND ELEVATION OF EXISTING UTILITIES SHALL BE <br />CONSIDERED AS APPROXIMATE AND INCOMPLETE. BEFORE ANY WORN <br />7 <br />POSER DOWN <br />F @a <br />LINE <br />IS PARAMOUNT 70 BOTH REDUCE FRICTION M THE RETURN <br />ALLOW FOR FREE FLOW RETURN W FUEL IN ME RETURN NINE. A <br />DOUBLE-WALL SECONDARY <br />1.3.38 THE TANK SHALL BE CONSTRUCTION <br />CONTAINMENT CgdSRiUCTRXJ BEARING ME LL 142 LABEL <br />TEST, <br />S STARTED, VERIFY AND COORDINATE ELEVATIONS AND SIZES OF <br />�� <br />BSER UP <br />FEW VALVE IS REQUIRED IN THIS SYSTEM IF SOURCE TARN 6 BELOW <br />THE CONTAINMENT SHALL BE EQUIPPED WITH A LEAK <br />1.6.1.2 LEVEL CONTROLLER: OPERATKXNAL TEST OF LEVEL SENSORS. <br />EXISRNG PIPING. 01SCREPANCiES 5EttlEEN FlELD DATA PND DATA ON <br />DAY TANK. G SOURCE TANK 5 BELOW DAY TANK, MANUAL PRIMING IS <br />DETECTOR THAT SHALL ACTIVATE THE PEAK ALARM <br />LEVEL INDICATOR LEVEL CONTROL. ALARM. BACKUP DEVICES. <br />DUNS AND SPECSHALL BE REPORTED TO ME <br />FLOW IN DIRECTION OF ARROW <br />REQUIRED. ONCE PRIMED, ME SYSTEM REMAINS SO FROM THE <br />DESCPoBED BELOW. A DRAIN WITH FIRE WED BALL VALVE K_ <br />1.6.1.3 PUMP. VACUUM TEST, FLOW TEST, PRESSURE TEST, LEAK <br />ARCHITECT, DO NOT PROCEED WITH 1NSTfU kUM IN AREAS Of <br />GATE VALVE <br />FEAT -VALVE ON ME SUPPLY LINE IN THE MAIN SOURCE TANK TO <br />TO BE SUPPLIED, THE CONTAINMENT SHALL BE EQUIPPED <br />PROOF TESTWPERE/VOLTACE TEST, LOAD TEST, OVERLOAD <br />DISCREPANCIES UNTIL OSCREPANCIES HAVE BEEN RESOLVED. <br />ME INLET OF ME DAY TANK MOUNTED SUPPLY PUMPS. <br />WITH A SEPARATE E -VENT AL RS BY '.42. <br />TEST. <br />A <br />BALL VALVE <br />A FULL OVERFLOW RETURN PIPE FROM EACH DAY TANK BACK <br />AS S <br />I.}_}.9 SUPPLY FIRE RATED BALL VALVES AS FOLLOWS: <br />I7 DAY TANK MANUAL. <br />4. THE CONTRACT DRAWINGO PND SPECIFICATIONS REPRESENT THE <br />NOT THE OF <br />MOTORIZED VALVE <br />6 <br />DON <br />TO THE BULK SOURCE TANK MUST BE PFGVIDED. WORKING VENTS TO <br />OUTDOORS MUST BE ROVIOED AS WELL AS AN EMERGENCY VENT FOR <br />TANKS 100 WLLONS A. LARGER. <br />1. DAY TANK DRAM <br />2, SECONDARY DONVAIAENT DRAIN <br />1.7.1 ME DAY TANK SPALL BE SUPPLIED WITH AN ILLUSTRATED <br />MANUFACNRER'5 MN:UAL THAT INCLUDES THE FOLLOWING: <br />FINISHED WORK. THEY DO INDICATE METHOD <br />CONSTRUCTION. SUPERVISE NO DIRECT THE WORK FOR ALL <br />CONSTRUCTION MEANS, MEMOOS, TECHNIQUES, SEQUENCES NTD <br />REDUCER OR INCREASER <br />4 FUEL DELIVERY SYSTEM: PROVIDE INSTALLED UPON THE DAY <br />131.1 REGISTRATION CERTIFICATE. <br />PROCEDURES. <br />( ) <br />10 IOL DAY iMN 2]5 CAI . <br />1.0 GENERAL PRQVIDE A ER. DA SIGN NEL OR DAY TANK <br />FOR EACH PRIME MOVER. DAY TAN BE COMPLETE IN <br />TANK, A RN BE! NEL OIL SUPPLY PUMP A DUPLEX NEL <br />OIL RETURN SET AND WERE% PUMP CONTROLLER MM <br />AUTOMATIC ALTERNATOR FOR SUPPLY Of FUEL FROM ME <br />7,7,12 GLOSSARY. <br />1.7.1.3 EQUIPMENT LIST. <br />5. VALVE$ SHALL BE LINE SIZE UNLESS OMERMSE NOTED. <br />6 NO MOLES SHALL D OR CUT IN OR ANY <br />"-""-"®"'-"-' <br />VOM` <br />VCM ROSE TO ABOVE PAWPET <br />B <br />p <br />AIL RESPECTS IN ORDER TO PROVIDE TH IME MOVER WITH <br />TNN HAMA TO THE DAY TANK AND RETURN FROM OVERFLOW <br />1 ] 1 4 DETAILED DESCRIPTION OF OPERATION. <br />EN THE ARC <br />STRUCTURAL ELEMENT WITHOUT APPROVAL OF THE ARCHITECT <br />WITHOUT <br />FLEXIBLE CONNECDUI <br />A RELIABLE, LOCAL SOURCE OF NEL. DAY TAN PLL BE FOR <br />TO THE MAIN TANK. THE A SUCTION -LFT <br />1 7.15 PUMP $7, <br />OR STRUCTURAL ENGINEER. <br />O <br />USE ERN MND TANK ANO NEL AUTORT SYSTEM D i@ED <br />ORDER TO PAO`ADC AN SELF-REFFU <br />APPLICATION: ADEQUATE IP I USED IN THE <br />PIPE SIZES MUS? <br />1 7 1 6 11M INSTRUCTIONS, <br />NROMAIIC, <br />NEL SUPPLY SYSTEM. <br />TOL U <br />AL <br />SYSTEM AND A F007 VALVE MUST BE INSTALLED IN THE <br />SYSTEM V <br />"'�_ EXISTING AWN TANK 1( MAIN TE BELOW LEVEL OF WY TANK. <br />INSTRU. <br />17.1 ] TROUBLE SHOOTING INSTRUC110N5. <br />TROUBLE <br />E SH SHOOTING <br />1. AS A MINIMUM STANDARD. ALL WON( SHALL COMPLY WITH THE <br />2013 REQUIREMENTS OF ME PLUMBING CGDE. AND <br />® <br />PONT OF CONNECTION <br />1.1 ME DAY TANK SHALL BE DESCRIEDNNUT AND SUPPLIED AS AN <br />-,. <br />MANUAL PRIMING OF THE SYSTEM IS REDUWED. <br />I.].1 8 MAINTENANCE INSTRIGTKKNS, <br />OF IONS TITLE <br />CALIFORNIANM CODE OF REGULATIONS TITLE 24. <br />® Pop <br />PORE Or DISCONNECTION <br />N <br />ENGINEERED SYSTEM BY ME MANUFACTURER. EACH TANK SHa1 <br />1,4.1 "DUPLEX PUMPS: 2 GPM SUPPLY PUMPS AND 4 GPM <br />1.7.1 9 PIPING DLAGRNA. <br />BE OF PACKAGED DESIGN i0 INCLUDE ALL MIET FLOW <br />CONTROL DEVICES, OTHER VALVES, LEVEL CONTROLS. PUMP <br />RETURN.P,UMPS Ai 1725 RPM AT 1725 RPM, WHEN <br />"`CRATING NOEL FUEL ql HAVING A VISCOSITY OF 32SSU. <br />1 ].1.10 ELECTRICAL DRAWING. <br />8. FIELD OBSERVATION AND SUPPORT SERVICES PERFORMED BY ME <br />ENGINEER PRIOR TO. DURING, OR MER CONSTRUCTION, ARE <br />ATF <br />AEG <br />ABOVE FlNISHED FLOOR <br />ABOVE FINISHED GROUND <br />A <br />CONTROL. INDICATORS, ALARMS AND A! OTHER DEVICE$ AS <br />TA.2 DIRECT DRIVE, MOTOR ORNEN PUMPS COUPLED VN <br />111.11 DIMENSIONAL DRAWING, <br />PERFORMED FOR THE PURPOSE OF ACHIEVING QUALITY CONTROL <br />ARCH. <br />ARCHITECTURAL <br />, p <br />REQUIRED TO FORM AN INTEGRATED, FUNCTIONAL SYSTEM SUCK <br />THAT FELE INSTALLATION IS RESTRICTED LARGE[ i0 EXTERNAL <br />FLEXIBLE CCUIPUNG. \ <br />i 6.3 MOTORS TO BE TEFL CONSTRUCTION, MP AS REGO RED <br />1 7.1.12 WARRANTY CARD. <br />AND SHALL NOT BE CONSTRUED AN SUPERVISION OF <br />CONSTRUCTION. <br />BEL. <br />B.O.P. <br />BELOW <br />BOTTOM Of PIPE <br />PIWNG, VI NO AND SUCH INTERMEDIATE DEVICES T Ai ARE <br />FOR `UTP AT 50 PSI NEMA DUTY AT <br />DA <br />DIAMETER <br />O <br />REQUIRED BY CODE ANO/OR GOOD ENGINEERING PRACTICE TO <br />0HER„COM15 SERV <br />40'C. 1725 RPM, 120V AC, 60 NERR.`ty5 SERVICE <br />'� <br />9. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REWIRED TEN <br />PERMANENT PERMITS. INCLUDING CERTIFICATES, <br />ON. <br />DWG /DINGS. <br />DOWN <br />DRAWING/DRAWINGS <br />ih�yiyil a <br />y <br />INTERCONNECT THE BULK SOURCE OF SUPPLY TO THE WAY <br />TANK, THE DAY TANK TO THE PRIME MOVER AND TO PROVIDE <br />FACTOR <br />IAA PUMPS TO BE DIRECTLY DRIVEN, POSE DISPUPCEMr;Ni, <br />AND LICENSES, <br />INSPECTIONS AND TESTS, <br />F <br />EACH <br />EXISTING <br />E <br />FOR VENTS 0.S PER LOCAL CODES AND ULI42. <br />CSAR TYPE WITH MECHANICAL SHAfT SEAL ANP. , <br />MST <br />10. VERIFY IAN. CHARACTERISTICS WITH ELECTRICAL DRAWINGS <br />%LIST <br />C%ISTNG <br />(% <br />NFPA31 AND NfPA37. <br />31 AND <br />FROM <br />CAST IR0.N BODY, MACHMm STEEL GEARS. <br />PRIOR i0 BID AND MATERIAL PURCHASE <br />O BID <br />ELECT. <br />ELECTRICAL <br />1.1 .1 THE SYS -M SHALL BC FOR USE WITH NEL OIL AS DESCRIBED <br />BY IN A321, 'BASIC CLASSIFICATION OF FLAMMABLE AND <br />1.45 FIRE RATED SHUTOFF BALL VALVES ON PUMP INLETS <br />1 46 PUMP CHECK VALVE, SPRING -TYPE, CAST IRON <br />FAB <br />FLEX. <br />NEL AIR SEPARATOR <br />RIXIBLE <br />y <br />R-1 <br />NOTICE TO CONTRACTOR <br />COMBUSTIBLE LIQUIDS'. AS DEFINED BY THIS STANDARD, THE CONSTRUCTION <br />NEL SUPPLY SYSTEM SHALL BE FOR USE WITH FCOMBUSTIBLE <br />:PDP <br />FUEL PIPE DROP PIT <br />a <br />LIQUIDS', THOSE HAVING A FLASH POINT AT OR ABOVE IOOF <br />1.4.7 FLOW5MTCH EACH PUMP <br />1.43 SUCTION SIRANER, CAST WON WYE TYPE FUEL OIL <br />FR <br />R <br />FROM <br />FEET <br />a� <br />AND FURTHER DEFINED AS CUSS II OR CUSS ill LIQUIDS IN <br />STRAINER ON EACH PUMP SUCTION <br />`\ <br />FTP <br />NEL TRANSFER PUMP <br />NC CASE SHALL A LIQUID DEFINED AS 'FLAMMABLE", OR AS <br />PLASS F OR AS HAVING A FLASH POINT LESS THAN LOVE BE <br />1 4B PROVIDE A PISTON TYPE, 0.1 GALLON PER STROKE HANG <br />PUMP INSTALLED AND PIPED AND EQUIPPED WITH <br />1 THE CONTRACTOR S MADE AWARE OF THE OOUCTYE ALTERNATE <br />CAL <br />'9S. <br />GALLON. <br />ROUNDS <br />USED. IN EVERY CASE. ME SYSTEM SHALL NOT BE USED OR <br />FIRE -RATED SHUTOFF VALVES. <br />``.,, <br />@1 FOR THE USE OF BLACK STEEL PIPE FOR ME ABOVE ME <br />LDM <br />FURL LEM DETECION k INVENTORY MCNROAWG SYSTEM <br />APPLIED AT A TEMPERATURE IN EXCESS OF THE FLASH POINT <br />GROUND FUEL OIL PIPING. <br />MAX. <br />MA%&NUM <br />OF ME CONTENTS. ELECTRICAL EQUIPMENT VMD IN THE <br />1.5 DAY TANK LEVEL CONTROLLER. A UL LISTED, INTEGRATED <br />`� <br />VOR. <br />MaMUFACIF RER <br />SYSTEM SHAH 9E IN ACCORDANCE WITH NEPA" SECTION 5-]. <br />pEyDy, DIOTAL LEVEL CONTROLLER SHAT BE SUPPLIED <br />1. ATTENTION IS BROUGHT TO THE CONTRACTOR FOR VENTILATION OF <br />POLISHING VERIFICATION 5 <br />MIN. <br />MMIIJIAA <br />WHEREIN li STATES 'FOR AREAS WHERE CUSS II OR CUSS In <br />LIE A TEMPERATURE <br />ONLY ARE STORED OREHANDLEDELECT <br />WHICH PROVIDES DIFFERENTIAL LEVEL CONTROL FOR <br />I Of PUMPS, DUPLEX PUMP ALTERNATOR LANK <br />` <br />ME EXISTING NEL OIL LINES. <br />FOR THE FUEL IOL POLISHING UNE$ AR BE A EFFECT <br />OP. WT. <br />PSI <br />OPERATING WEIGHT <br />PER SQUARE INCH <br />OW IC MAY <br />BELOW THEIR FLASH POINTS, THE ELECTRICAL BODEMENT <br />LEVEL INI <br />LEVEL MIICARGO SYSTEM AIMMS AND MANUAL OPERATING <br />` <br />CM FICTION 10 ICE UNDERGROUND NEL qt UNA AND THAT NO <br />MIND <br />ROUND PER SQUARE f00T <br />L <br />BE INSTALLED IN ACCORDANCE MIN PROVISIONS OF NfPA70, <br />CONTROLS. LFVEI CONTROLLER SHALL dE SELF -CONDONED <br />LINES ARE CONNECTED FROM THE NEL IOL POLISHING STATION i0 <br />LINES ARE <br />SF <br />9 <br />FEET <br />PLATFORM ELECTRIC CODE, FOR ORDINARY LOCATIONS..' <br />AS A ONO WTRRN A NEW ENCLOSURE INTEGRAL WITH THE <br />THE EXISTING DAY TANK THRU ME DUSTING TRENCH. SHOULD THE <br />\ MDINGB INDICATE THE LATTER. THE CONTRACTOR SHALL NOTIFY <br />TOP. <br />TVP. <br />TOP <br />TOP OF PIPE <br />TYPICAL <br />'.t7 ME SYSTEM SHALL BE DESIGNED AND MSTAIlED IN <br />ACCORDANCE WITH APPLICABLE SECTIONS OF NFPA30. 111 <br />DAY TANK ASSEMBLY. <br />1.5.1 PLC BASED WFIH 6 -MCH. COLOR, TOUCH PANEL <br />THE\OWNER AND THE ARCHITECT AS TO HOW TO PROCEED, <br />FUR OIL OETAL NUMBER <br />t <br />NFPA37, UUM AND ULI42 ME DAY TANK SHALL BEAR ME OPERATOR INTELEADS <br />THAT <br />3. CONTPACTt�R. HALL VERIFY THAT ME FXSTINC NEL OIL POL1SHi4G <br />-- FUEL OIL DETAIL SYMBOL <br />LABEL. OF UNDERWRITERS LABORATORIES STANDARD 142 AND <br />1.52 CUAL LEVEL. SENSOR INPUT: <br />LINES FROM TH ISiING STATION TO THE <br />XXX <br />UL508. <br />1,2 INSULATION GENERA: THE DAY TNA SHALL BE INSTALLED <br />-4-20MA CONTINU"IIS SENSOR, ANALOG -IO -DIGITAL INPU' <br />_POM SENSING FLOAT SWITCHES: LOW, REFILL START, <br />UNDERGROUND TAN E IN GOOD WORKING CONDITION. PROVIDE A <br />FLFt IOL DRAW9MG NIAWCR w1EM DETAIL 6 SHOWN <br />ADJACENT TO THE PRIME MOVER, ON THE SAME GRADE WSTA <br />REFILL STOP, HEM, CHECKPgM FOR AUTOMATIC CHOSE <br />TFMPoRART PORTABLE P FINING SYSTEM FOR ME EXISTING DIESEL <br />FUEL IN UNDERGROUIND TANF!F:{ PROCEED TOA ONE TIME <br />FUEL OIL EOUIP" OR FI#AWE MEROVIATpN <br />(AS SHOWN ON THE PIAN DRAWINGS. [AS DETAILED HERELI <br />CHECK OF SENSORS <br />Pg1SHING OF THE EXISi!NG FUEL tt1,TANK. ONCE THE PROCEDURE <br />XX <br />ON A HO'JSEKEEPMG PAD ADJACENT TO THE PRIME MOVER. <br />1.5.3 LEAK SENSOR <br />' <br />HAS BEEN DONE THE CONTRACTOR SFEALL THOROUGHLY CLEAN THE <br />FUEL OIL CWWMEM QU FIXIIWC SYMBOL <br />NGNOP TANK TO THE PAD. <br />1.2.3 PROVIDE SCHEDULE 40, PIN A 53, BLACK II PIPE <br />CONNECTMXNS TO ME DAY TANK AS SHOWN. MAKE ALL <br />1.54 SPARE 1/O TOR OPTIONS AND DESIGN -BUILD FEATURES <br />1.5.5 MORBUS AND ETHERNET NETWORK COMPATIBLE <br />€. <br />^"f ���4�gb <br />LIMES AND PROCEED i0 REMOVAL OF THE ABO'JE ANC <br />BELOW GROUND E A MANNER ACCEPTABLE TO ME AUTHORITIES <br />FUEL Olt EQUIPMENT OR FIXTURE OESCtN1ED NUMBER <br />CONNECTIONS TO FIXED INSTALLED PIPE WITH PIPE UNIONS TO <br />15.6 4-20MA LOOP OUTPUT FOR TANK LEVEL <br />1. 57OPERATOR TOUCH -PANEL INTERFACE FUNCTIONS: <br />4 <br />4 <br />HAVING JURISDICTION, THE REMOVAL OF THE LINES M THE <br />UNDERGROUND TANK SUMPS) SHALL BE EXECUTED MAINTAINING <br />FACILITATE TARN SERVICE/REMOVAL. <br />(1) SUPPLY TO DAY TWO, INLET TO DAY TANK PUMP <br />-HOA SWITCH <br />-TLST <br />$ <br />THE MIECflfIY OF ME SUMP WALLS AND ANY BE RS LFAX <br />THE <br />DETECTION AND MONITORING SYSTEM. MANHOLE PIPE PENETRATIONS <br />(2) DAY TANK DUPLEX RETURN PUMPS SET `0 RETURN <br />-RESET <br />ysT'9' <br />="+ <br />SHALL BE SEALED PER THE SUMP MANUFACTURERS <br />Y <br />OVERFLOW i0 BULK SUPPLY <br />3 SUPPLY AND RETURN 10 PRIME MONTH, AS RECOMMENDED <br />1) <br />-NMDA SILENCE <br />., <br />RCCOMMCNDATIONS. <br />PRIOR TO COMMENCPG <br />EXCAVATION CONTRACTOR <br />BY MANUFACTURER. <br />-NUMERIC CSPLAY OF TANK ILVEL iN GALLONS (uTERS) <br />'��.0 H x <br />-.Aa`i <br />4. CONTRACTOR SHALL VERIFY MAI ME EXISTING ME'OIL <br />.. SHALL COORDINATE WIN1 <br />DRAWINGS THAT MAY MOTE <br />ME DIMER AND RECORD <br />EXSTING UTILITIES IN <br />! <br />■ <br />(4) VENT SIZES SHALL dE AN SHOWN AND AS REWIRED BY <br />AND AS <br />-GRPMC CONO110N DISPLAY O< TANK LEVEL AND <br />a=+q, xEIS'fi-. <br />^N 1 <br />UNDERGROUND TANK REMAMMG SYSTEMS ARE IN GOOD WORKING <br />ANY DETRINENIA FAC10� SMALL BE REPORTED <br />THE AREA ERECTED BY iN5 PROJECT <br />LOCAL, AN B! UL 142.NFPA3I NFPA37 <br />WELL a PROJECT SPECIFICATION FUMMIUNENTS. <br />PUMP/STATUS/AIARM CONDITION <br />s <br />%�*'" d <br />CONDITION PND <br />i0 THE OWNER PND ME ARCHITECT PRIOR TC FOLLOWING WIM <br />y <br />ii57 <br />1.3 DAY TANK RATINGS <br />-MESSAGE INDICATIONS FOR STATUS AND ALARM. INCLUDING: <br />6 ^+' <br />PROCEDURE <br />i <br />13,1 CAPACITY'. (275) GALLONS <br />-NORMAL OPERATION <br />r <br />1 <br />a i <br />3.2 POWER REQUIREMENTS (I IOC/ AC, SINGLE-PHASE. 60HERTZ. <br />PUMP RUNNMG (ILL. RETURN. SINGLE OR MULTIPLE PUMPS <br />- ( ) <br />x#- <br />tl <br />BRAN <br />154 AALCODEDICATED RU 71O CWCUIT =ANAL FlLLMG <br />.3.} DAY TANK CONSTRUCTION <br />1.3.3.1 ALL WELDED STEEL ATMOSPHERIC TANK OF RECTAGULAR. <br />DOUBLE-WALL SECONDARY CONTAINMENT, WELDED <br />-LOSS OF FLOWS: <br />-LOW <br />G <br />t�%T a. F <br />CONSTRUCTION BUILT IN ACCORDANCE WITH CODES AND <br />CRITICAL LOW <br />STANDARDS NOTED ABOVE FOR INDOOR USE WITH NEL OIL. <br />13.3.2 PIPE THREAD CONNECTIONS SHALL BE PROVIDED FOR NEL <br />-HIGH <br />fi <br />OL SUPPLY FROMREMOTE RUMP SET. SUPPLY i0 `RITE <br />MOVER, RETURN FROM PRIME MOVER, OVERFLOW TO MAN <br />-CRITICAL HIGH <br />-LEAK <br />40219.0E <br />TANK. VENTS, AND DRAIN WIN FIRE RATED BALL VALVE. A <br />-NOT IN AUTO <br />t <br />.4eyA t= UPIA •GALFE(; <br />11-02-14 <br />WEATHERPROOF, SCREENED VENT CAP SHN1 BE PROVIDED -CONTROLLER FAILURE WITH SPECIFIC MESSAGE <br />AS A L009 ITEM FOR FIELD INSTALIAiION' Al M_CONLL <br />E OUTDOOR <br />eq <br />ntr W�A8A0[o PAtMAX <br />VENT TERMINATION. A WEIGHTED TYPE EMERGENCY VENT CAP <br />�i�4+oAFA' +a N pAyApgN,N�y <br />p <br />S <br />SHALL BC SUPPLED INSTALLED ON THE PRIMARY TANK AND <br />aaTT pm)4Aea(w <br />PAILimi�Y <br />