Laserfiche WebLink
DEMO SHEET NOTES <br />e g <br />❑I (E)FOS, (E)FOR & DIESEL FUEL OIL UDERCROUND TANK VENT 70 G S <br />REMAIN. (E)LINES SIZE SHALL BE VERIFIED A'. THE SITE BY THE <br />DIESEL FUEL PIPING INSTALLER. m <br />(E)UNDERGROUND DIESEL NEL STORAGE TANK TO REMAIN. U <br />❑3 (E)DAY TANK & (E)FOS. (E)FOR SHALL BE REMOVED. SEF ®Q. <br />ARCHTECTUFAL DWGS. FOR FURTHER INSTRUCTIONS ON DISPOSING L <br />OF THE (E) DAY TANK.(E)DIESEL AD OIL U <br />6 <br />ESTATION <br />CONTRACTOR SHALL VERIFY PRORTO ANO REMOVED. <br />TTHESUPPLY AND U ® <br />- CLEANED RETURN LINES ORIGIN AND TERNINRRON VERIFICATION OF pp <br />FUEL OIL. CLEANING LINES SHALL BE CONDUCTED BY CONTRACTOR. C2 <br />PNONGS SHALL BE REPORTED TO THE ARCHITECT AND MECHANICAL " <br />ENGINEER PRIOR TO REWVTNG AND/OR CAPPING ANY (E)LINES. 9 4e <br />...... <br />EXACT SIZE, ELEVATION, &LOCATION OF EX5'ING SHALL BE FIELD <br />. VERIFIED. � •••••• <br />(E) UNDERGROUND DIESEL FUEL STORAGE TANK VENT BUR BE •••••• <br />RELOCATED 70 NEW SUPPORT LOCATION. SEE ARCHIL DWOS. <br />-....... .-. ..... FOR SUPPORT RELOCATION, NO SAGGING 0P CRIMPINGNG OFRAOF VENT UNE <br />_ .. _... '. WILL BE ALLOWED. _. <br />\ i <br />' � y <br />, V <br />3i <br />s o <br />b� <br />.. ,". <br />TUN 12 <br />/ , 2 <br />... <br />AREA OF WORK <br />oil <br />a <br />,NORTH NORTH / <br />ISSUE FOR BID 11/19/14 <br />X04 Jf"�i 11-02-1 <br />.yam. � i LINA .1_41PE1: <br />V � 1' 1i-02-14 <br />nm � � �Pli[wei <br />P-2,/A._,._O. <br />OVERALL — EXISTING CONDITION 1 PLUMBING PARTIAL PLAN — DEMOLITION 2 �'E�"«�` E. <br />i._ZO._0. <br />PAS 6b M6BM <br />