My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_2012-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 3:36:41 PM
Creation date
6/23/2020 6:47:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2017
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
217-021-04
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231425_430 W CENTER_2012-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. TANK ANNULAR TESTING <br /> Test Method Developed By: n Tank Manufacturer Industry Standard ❑Professional Engineer <br /> [:]Other(Sjmcal.iv)I <br /> Test Method Used: E]Pressure Vacuum Q Hydrostatic <br /> El Other(Sped fi) <br /> Test Equipment Used:0 TO 30"HG. GLYCERIN FILLED VACUUM GUAGE Equipment Resolution: 0.1"HG. <br /> 0: <br /> Tank# 1 Tank# Tank# Tank# <br /> . <br /> IsTankExempt From Testing".)l []Yes No []Yes []No []Yes []No F]Yes nNo <br /> Tank Capacity: 6,000 GAL. <br /> Tank Material: STEEL/FIBERGLASS <br /> 'rank Manufacturer: DOOR <br /> Product Stored: DIESEL <br /> Wait time between applying <br /> pressure/vacuum/water and 30 MIN. <br /> starting test: <br /> 'rest Start Time: 8:45 AM <br /> Initial Reading(Rj): 10" HG. <br /> Test End Time: 9:45 AM <br /> Final Reading(Rr): 10" HG. <br /> 'rest Duration: 1 HOUR <br /> Change in Reading(Rj:-Rt): 0 <br /> Pass/Fail Threshold or Criteria: 0.000 <br /> Test Result. 21 Pass n Fail [I Pass El Fail [:]Pass []Fail 0 Pass El Fail <br /> Was sensor removed for testing? EjYes [:]No [:INA []Yes [:]No EINA E]Yes[]No []NA E]Ycs E]No [INA <br /> Was sensor property replaced and <br /> verified functional after testimr? EjYes FINo FINA []Yes [:]No nNA E]YesE1No [:]NA nY,--,s nNo EINA <br /> Not Tested F] Repairs Made Fj Not Tested[:] Repairs MadeE] Not Tested El Repairs Made r Not Tested F] Repairs Made <br /> Comments—(inchide ii!fbrmation on repairs made prior to testing, and reconinielided,follow-up,lorf(lilecI tests) <br /> Rk <br /> J L! 2 017 <br /> N-A <br /> Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or tinder constant vacuum,are exempt from periodic containment <br /> testing. (California Code of Regulations,Title 23,Section 2637(x)(6)} <br />
The URL can be used to link to this page
Your browser does not support the video tag.