My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_2012-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 3:36:41 PM
Creation date
6/23/2020 6:47:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2017
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
217-021-04
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231425_430 W CENTER_2012-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer Q Industry Standard ❑ Professional Engineer <br /> ❑Other(SpeciN) <br /> Test Method Used: RIPressure ❑Vacuum ❑ Hydrostatic <br /> E3 Other(Specify)F- <br /> Test Equipment Used:0 TO 15 PSI GLYCERIN FILLED PRESSURE GUAGES Equipment Resolution: 0.1 PSI <br /> 251 <br /> P.iping Run#----URN GEN Piping Run#SUPPLYMETURN POI Piping Run#suPPLY POLMHER Piping Run# <br /> Piping Material: PLASTIC PLASTIC PLASTIC <br /> Piping Manufacturer: TOTAL CONTAINMENT TOTAL CONTAINMENT TOTAL CONTAINMENT <br /> Piping Diameter: 4" 4-1 4" <br /> Length of Piping Run: 45' 45' 8 <br /> Product Stored: DIESEL DIESEL DIESEL <br /> Method and location of 4"TEST DONUT 4"TEST DONUT 4"TEST DONUT <br /> piping-run isolation: <br /> Wait time between applying <br /> pressurelvacuum/water and 30 MIN. 30 MIN. 30 MIN. <br /> starting test: <br /> Test Start Time: 8:45 AM 8:45 AM 8:45 AM <br /> Initial Reading(Rt): 5 PSI 5 PSI 5 PSI <br /> L <br /> Test End Time: 9:45 AM 9:45 AM 9:45 AM <br /> Final Reading(RT): 5 PSI -5 PSI 15 PSI <br /> Test Duration: 1 HOUR 1 HOUR 1 HOUR <br /> Change in Reading(RF-R,): 0 0 0 <br /> Pass/Fail Threshold or 0.000 0.000 0,000 <br /> Criteria: I <br /> Test Result: ZPass []Fail ®Pass []Fail 21-Pass E]Fail I []Pass DFail <br /> Not Tested F] Repairs Made Lj Not Tested U Repairs Made f Not Tested L]Repairs Made U Not Tested LJ1 Repairs Made= <br /> Comments— (include itrfortnation otz repairs made prior to testing, attd recontmetaded follow-up for failed tests) <br /> A <br /> ENV r-" �"t <br />
The URL can be used to link to this page
Your browser does not support the video tag.