Laserfiche WebLink
t ear _. <br /> SWRCB,January 200T Page of <br /> 4.. TANK ANNULAR TESTING <br /> Test Method Developed By: X Tank Manufacturer X Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure X Vacuum Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used:Vacuum Gauges Equipment Resolution: <br /> Tank# g, 7X. Tank# . 79 Tank#3 E. Z25 <br /> Tank# <br /> Is Tank Exempt From Testing?' Yes <M Yes Yes o Yes No <br /> Tank Capacity: D --'a 1.. <br /> ¢-6 1 <br /> Tank Material: s <br /> Tank Manufacturer: o <br /> Product Stored: O 6,neIR 7d p <br /> Wait time between applying <br /> pressure/vacuum/water and 3 'W i4(. <br /> starting test: 1,41o to ®3 t i2 m s <br /> Test Start Time: 7:360 low `7 . o q-®® 9-077 <br /> Initial Reading(Rj): `® ,e 1 n Z•� <br /> Test End Time: t`;00 *.,yt <br /> Final Reading(RF): t / 6 _.1 p <br /> Test Duration: a <br /> Change in Reading(RrRj): -8- <br /> Pass/Fail Threshold or Criteria: .- <br /> Tes Resuit:. M T#°a� r 7ai1= <br /> Plass Ea i <br /> a Y <br /> ,..., 6,.W. ..� �;. <br /> Was sensor removed for testing? es No NA No NA No NA Yes No NA <br /> Was sensor properly replaced and No NA es No NA No NA Yes No NA <br /> verified functional after testing? <br /> —j <br /> Comments (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> :fh'4'2 -.2 O�G7� �,® 6,'3 epore' If I <br /> A[AdA 29115 i 9 6,G !2 aemy $7 d <br /> 1-"k"`- 3 E',4f 7-4w& s SoI4 � (ice— 1�_r �O-1 ID ed .=.46,00- Diese.4 ` /Vo <br /> 10® x )t & ®4& <br /> Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. {Califomia Code of Regulations,Title 23, Section 2637(a)(6)1 <br />