Laserfiche WebLink
.rte. <br /> SWRCB,January 20OZ Page 3 of <br /> S.. SECONDARY PIPE TESTING: <br /> Test Method Developed By: X.Piping Manufacturer X Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: X Pressure Vacuum Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used:Pressure Gauges Equipment Resolution: <br /> Piping Run# Piping Run#A Piping Run#3 Piping Run# <br /> Piping Material: ® 0 S I•® <br /> Piping Manufacturer: <br /> Piping Diameter: i`2'® 2 Y2..f 2 V2."' .'�% if <br /> Length of Piping Run: ® 1 ® U ® P740 <br /> Product Stored: g wm p p <br /> Method and location of <br /> piping-run isolation: p. -Ks~ g -5 kDe ems Za_ <br /> Wait time between applying <br /> pressure/vacuum/water and ,S /,iy, 6 6. <br /> starting test: s,. <br /> Test Start Time: o ' q; <br /> Initial Reading(Rj): 5 P. S.Z . <br /> Test End Time: <br /> Final Reading(RF): 5 E3 A 5.2'. <br /> Test Duration: fl 5 <br /> Change in Reading(RF-Ra): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test'RtmdttaA � x '^ °dS Fail <br /> Comments—.(include information on repairs made prior to testing, and recommended follow-up for failed tests) ®® <br /> Y'1 DT_r i {� yGS -�I9 `i eerdr r�P f°.`®� f 'tea pZ �r/ ' l <br /> 10 -76- P-5, Fa / °4 /:�r Tom. � _5. <br /> ig4 a Raw /® 97 e -4,41 h ) Aoo k D <br /> 9,At,VA ;2 Ir' e, <br /> h.ed 5�d de, lic T---.t ,5 P. <br /> k5eo T® r'um 7a�4 Fg, Acgs 4i&d 49k--6,e- <br />