Laserfiche WebLink
J. 4, <br /> �` <br /> SWRCB January 2002 Page- <br /> _,o of <br /> 6.. PIPINGSUMFTESTING <br /> Test Method Developed By: X Sump Manufacturer X Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum X Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used:Incon Equipment Resolution: <br /> Sump#S r�"d Sump#42 Sump# Sump# <br /> Sump Diameter. <br /> Sump Depth: I V2 ;2 4 <br /> Sump Material: F 6 ` $ P t bee4/ S <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: 1 `� ;z`` <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: t <br /> Condition of sump prior to testing: DiA tY% ®t�� <br /> Portion of Sump Tested' <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes No NA No NA Yes No NA Yes No NA <br /> product and water)?` <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe es No NA Yes No NA Yes No NA Yes No NA <br /> shutdown? <br /> Was fail-safe verified to be Yes o NA Yeso No NA Yes No NA Yes No NA <br /> operational?" <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15' <br /> yrr i /5 It�i✓. <br /> test: i a/72-),g <br /> Test Start Time: . 1 O; 142:441A" <br /> Initial Reading 419 <br /> Test End Time: .11 ,91 4 M 11 :0 <br /> Final Reading(RF): g <br /> Test.Duration: 15 rh i 15 YWAI <br /> Change in Reading(RF-&): -t, DU/s ppc� <br /> Pass/Fail Threshold or Criteria: +/-.002 +/-.002 +/-.002 +/-.002 <br /> Te <br /> Rasw ]fail,, Pass Fall", <br /> Was sensor removed for testing? es No NA No NA Yes No NA Yes No NA <br /> Was sensor properly replaced and <br /> verified functional after testing? es No NA No NA Yes No NA Yes No NA <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />