Laserfiche WebLink
- <br /> t r <br /> SWRCB,.January 2002 Page 6 ofd <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed.By: X Sump Manufacturer X Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum X Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used:Incon Equipment Resolution: <br /> Sump# cd Sump# $ Sump# Sump#dl 1I0 <br /> Sump Diameter: .2®® f ®® <br /> Sump Depth: '/ SIS�® y 3 3 t •• <br /> Sump Material: /,05.3 F® 6 eftw 1' 4 <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: ' oZ / / 7 <br /> s/ e r <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: De' Lai <br /> Portion of Sump Tested' ysze <br /> Does turbine shut down when <br /> sump sensor detects liquid(both es No NA Yes No N-A es No NA es No NA <br /> product and water)?" <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe <br /> shutdown?" e No NA No NA No NA No NA <br /> Was fail-safe verified to be yeso NA Yes NA Yes (S NA Yes <Q NA <br /> operational?" <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15- <br /> test: -4.4//v ® t P ! tea. /3/e,Z_ ! e o 2 <br /> 'Test Start Time: D ;0' g 46 <br /> Initial Reading(Rj): I, S 13 8S5 4 .0 :Z,0.5 <br /> Test End Time: /0; ;L 2, q M /D L0 3 A0 <br /> Final Reading(RF): , ?55 V <br /> Test Duration: 15 1"IN l5 !.;f/ 9E M./& 15 '1'rl a <br /> Change in Reading(RF-Rj): -f. &vel 9 d a '. 0011 <br /> � • �►00 <br /> Pass/Fail Threshold or Criteria: +/-.002 +/-.002 +/-.002 +/-.002 <br /> s Eazk , Falx ass £a0 <br /> >�_ <br /> Was sensor removed for testing? es No NA es No NA No NA No NA <br /> Was sensor properly replaced and yes No NA es No NA No NA Yes No NA <br /> :] <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />