Laserfiche WebLink
• <br />SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />• <br />Page _3_ of _7_ <br />Test Method Developed By: ® Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />nt Used: 0 -15 PSI TEST GAUGES <br />Piping Run # 87 Piping Run # 91 <br />*PipingMaterial:FIBERGLASS FIBERGLASS <br />Equipment Resolution: <br />Piping Run # DSL <br />0.002" <br />Piping Run # <br />FIBERGLASS <br />Piping Manufacturer: <br />A.O. SMITH <br />A.O. SMITH <br />A.O. SMITH <br />Piping Diameter: <br />2" / 3" <br />211/3" <br />2" / 3" <br />Length of Piping Run: <br />80' <br />80' <br />80' <br />Product Stored: <br />87 <br />91 <br />DIESEL #2 <br />Method and location of <br />piping -run isolation: <br />TEST BOOT <br />TEST BOOT <br />TEST BOOT <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 MIN <br />15 MIN <br />15 MIN <br />Test Start Time: <br />8:30 AM <br />8:30 AM <br />8:30 AM <br />Initial Reading (RI): <br />5.0 PSI <br />5.0 PSI <br />5.0 PSI <br />Test End Time: <br />9:30 AM <br />9:30 AM <br />9:30 AM <br />Final Reading (RF): <br />3.5 PSI <br />5.0 PSI <br />5.0 PSI <br />Test Duration: <br />1 HR <br />1 HR <br />1 HR <br />Change in Reading (RF -RI): <br />-1.5 PSI <br />0 PSI <br />0 PSI <br />Pass/Fail Threshold or <br />Criteria: <br />NO LOSS <br />NO LOSS <br />NO LOSS <br />Test Result: <br />El Pass ®; Fail <br />®:Pass ❑ Fail <br />Z Pass ❑ Fail <br />❑ Pass El Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />ABOVE ARE ALL PRODUCT SECONDARY LINES. <br />LEAKS FOUND AT UDC# 1 - 2 & 3 - 4 ON 87 LINE AT COMPRESSION NUT FOR BRAVO'S SECONDARY LINE <br />TERMINATION. <br />CRACKS ON RUBBER GASKET. <br />