My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 12:06:22 PM
Creation date
6/23/2020 6:49:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231488_2501 JACKSON_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: D Tank Manufacturer X Industry Standard D Professional Engineer <br /> D Other(Spec) <br /> Test Method Used: ❑Pressure X Vacuum D Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Tank#87 Tank#91/DSL Tank# Tank# <br /> Is Tank Exempt From Testing?' Yes X No Yes X No D Yes No ❑Yes No <br /> Tank Capacity: 12,000 12,000 <br /> Tank Material: FIBERGLASS FIBERGLASS <br /> Tank Manufacturer: TOTAL TOTAL <br /> CONTAINMENT CONTAINMENT <br /> Product Stored: — GAS GAS/DIESEL <br /> Wait time between applying <br /> pressure/vacuum/water and 5 MIN 5 MIN <br /> starting test: <br /> Test Start Time: 12PM 12PM <br /> Initial Reading(RI): 10PSI I OPSI <br /> Test End Time: IPM IPM <br /> Final Reading(RF): I OPSI I OPSI <br /> Test Duration: IHR 1HR <br /> Change in Reading(RF-RI): 0 0 <br /> Pass/Fail Threshold or Criteria: 0 0 <br /> © .ail!. <br /> Was sensor removed for testing? X Yes D No ❑NA X Yes No ❑NA Yes D No D NA D Yes ❑No ❑NA <br /> Was sensor properly replaced and <br /> verified functional after testing? X Yes ❑No ❑NA X Yes ❑No DNA Yes 11No ❑NA ❑Yes D No ❑NA <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 'Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing, (California Code of Regulations,Title 23,Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.