Laserfiche WebLink
. ti <br /> SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer X Industry Standard 0 Professional Engineer <br /> 0 Other(Sped) <br /> Test Method Used: X Pressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(Specify) <br /> *Equipment Used: Equipment Resolution: <br /> Piping Run#S7 Piping Run# 91111 11!: lialm! <br /> Piping Run# <br /> '07 DIESEL <br /> al: FIBERGLASS FIBERGLASS FIBERGLSS <br /> Piping Manufacturer: SMITH SMITH SMITH <br /> Piping Diameter: 2" 2" 2" <br /> Length of Piping Run: 15' 15' 15' <br /> Product Stored: GAS GAS DIESEL <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 MINUTES 15 MINUTES 15 MINUTES <br /> starting test: <br /> Test Start Time: 12:00 PM 12:00 PM 12:OOPM <br /> Initial Reading(RE): 5 PSI 5 PSI 5 PSI <br /> Test End Time: 1:00 PM 1:00 PM 1:OOPM <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI <br /> Test Duration: I HR 1 HR I HR <br /> Change in Reading(RF-RI): 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 <br /> Criteria: <br /> Tesf Refit° ..... X Fd85 I7 I+ai G? +` it.. .....:. <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />