Laserfiche WebLink
Grade Level Spill Containment Manholes <br /> 705,-715, 726-GL (5,150 & 26.Gallon) <br /> Installation Instructions Check For Leaks <br /> Before installing a spill container, coat all of the riser pipe, Every unit should be tested for leaks prior to,and after, <br /> threads with a thread sealant that is compatible with the I pouring concrete. If this model comes with a drain,close <br /> product in that tank. it. If not, install a 90022-01 test drain kit. Fill the unit <br /> Install the spill container by threading it onto the tank riser completely with water. If the test water leveldrops at all <br /> pipe until it Is hand tight: Do not use the upper cast iron within one hour,then a leak exists(this is not an EVR test). <br /> ring to fully tighten the container.Tightening the tank using Check to see that the drain valve is seated-properly. If not, <br /> the upper cast iron ring can cause undue stress to the then PULL the drain valve several times on a PULL TO <br /> entire unit, PUSH DRAIN UNIT Replace the valve if it continues to <br /> After hand tightening,place a torque wrench assembly leak. <br /> around the lower portion of the tank base and torque the If the unit continues to leak, the entire spill container must <br /> spill bucket base on a riser pipe to 60-90 ft.lbs.torque be removed from the riser pipe and replaced with another. <br /> using an EBW chain wrench(part#901-101-01)and a RE-TEST <br /> torque wrench with at least 100 ft.lbs.of torque range After backfilling the area with pea gravel and pouring <br /> (due to an offset of chain and torque wrenches,actual <br /> torque wrench values will be 45-70 ft. lbs.). After an initial concrete,RE-TEST to make sure that no damage occurred' <br /> during installation. <br /> torque value is obtained, continue to thread the tank base <br /> onto the riser pipe until the drain valve is orientated to the: <br /> riser low spot. <br /> Lid <br /> Note:'All of the tank risers have some out-of-plumb <br /> characteristics due to slight tank tilts and rolls. To Duct Tape <br /> properly drain,the drain valve must be located at <br /> the low spot of the riser tilt. The riser low spot is <br /> DU ct Tape <br /> the direction the riser pipe is leaning towards. This <br /> is easily obtained by placing a small amount of 4 <br /> 4 4 A <br /> water in the bucket base and turning the bucket <br /> until the water runs to the drain valve. Co t Drive Concrete Drive <br /> 4 <br /> If space is limited(i.e. a retrofit installation to a sawed out: 0' <br /> 4 <br /> 1 4 <br /> 4 <br /> section of concrete): <br /> 1) Make sure that the inside riser pipe is removed. Figure A.,Protect drainage grooves <br /> 2) Locate the fitting that the inside riser pipe threads' <br /> into. <br /> 3) Coming down through the top of the unit, use a <br /> special socket wrench on the octagonal surface <br /> of the fitting to finish tightening it. Do not <br /> disassemble the unit. <br /> • The top edge of the rim must be positioned <br /> a minimum of 2"above the driveway level to <br /> provide an adequate slope for drainage. <br /> • Before pouring cement,place duct tape <br /> • around the rim,this will keep the cement out of <br /> the drainage grooves when the lid is in place. <br /> See figure A.After cement has solidified, <br /> remove any duct tape or excess cement. <br /> Note: If you want to seal off a drain to test your unit, <br /> install a test drain kit(part#90022-01). <br /> 2010 <br /> ENVIRONMENTA� 141EALTH <br /> R TMENT <br /> DEPA <br /> 3 <br />