Laserfiche WebLink
5 Gallon Spill Containers <br /> Figure B:5-Gallon Installation <br /> This surface should be sloped 1"from <br /> grade or per customer specifications <br /> 3.5"minimum to allow for fill <br /> cap and tank movement. <br /> 4.00" <br /> 17.12"Ring Adapter Width—► <br /> — Cast Lug <br /> Cast Iron Ring <br /> 1.00" '., Insulation <br /> Grade <br /> 17.00" 15.88" Concrete Drive..." <br /> Composite '; Concrete Drive` :: ., . <br /> Base 93.06" ,a.- ": Dia. : <br /> 15.88" '-- .' '..•'" .i4.. ,,, -:•:.•�` -�.. <br /> Cast•Iron ?'�''•'`'''-w;. :.f Apo,..>rs :•-:a,,.: .•..._._..:, .. <br /> pea Gravel Guard <br /> Base <br /> I'eati <br /> ^�.•' �.,a. Gravel". -. <br /> _ �; t•i:: Fill, <br /> Octagonal Surface <br /> Round Surface <br /> Length of riser <br /> pipe to be determined by <br /> Note:Locatioh of drain valve contractor to the field <br /> assy.or test plug. <br /> Recommended Inside Riser Pipe Lengths for 5 Gallon Spill Containers <br /> 5"-For conventional top and side seal adaptors(EBW 776&778) <br /> 4"-For swivel type product adaptors and conventional coaxial adaptors(EBW 778&306) ' <br /> 3"-For swivel type poppeted vapor adaptors and self-sea:ling coaxial poppeted adaptors(EBW 300&306 CA) <br /> R C <br /> Fa� a <br /> V! I.. D <br /> The above figures may contain components(including part numbers)that have not been certified by the California Air <br /> Resources Board(CARB)for a specific Phase I Vapor Recovery System. Please refer to Exhit�it 1,off the apprp �i to <br /> CARB Phase i Executive Order for a list of Phase I Vapor Recovery System Equipment. (Yav`lr°�x_,;NN1, .,# <br /> 4 D RI,'RTMN T <br />