My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 12:06:22 PM
Creation date
6/23/2020 6:49:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231488_2501 JACKSON_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB", January 2002 <br />Page of <br />S. SECONDARY PIPE TESTING <br />Test Method Developed By, <br />D Piping Manufacturer El Industry Standard D Professional Engineer <br />0 Other (Specify) <br />Test Method Used: <br />X Pressure <br />0 Other (Specify) <br />0 Vacuum <br />0 Hydrostatic <br />Test Equipment Used: <br />?!ping Run # 87 <br />Piping Run # 91 <br />Equipment Resolution: <br />Piping Run N DSL Piping Run <br />Piping Material: <br />FIBERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />Piping Manufacturer: <br />SMITH <br />SMITH <br />SMITH <br />Piping Diameter: <br />35% <br />3p9 <br />3" <br />Length of Piping Run. <br />451 FT <br />351 FT <br />20' FT <br />Product Stored: <br />GAS <br />GAS <br />DIESEL <br />Method and location of <br />pip!na-run isolation; <br />Wait time between applying <br />pressure/vacuum/water and <br />startim test: <br />15 MINUTES <br />15 MINUTES <br />15 MINUTES <br />Test Start Time: <br />9.45 AM <br />9:45 AM <br />9.45 AM <br />Initial Reading (RF): <br />5 PSI <br />5 PSI <br />5 PSI <br />Test End Tjxne: <br />10:45 AM <br />10-45 AM <br />10,45 AM <br />Final Reading (ftf): <br />5 PSI <br />5 PSI <br />5 PSI <br />Test Duration: <br />I HR <br />I HR <br />I HR <br />Change in Reading (RrR,). <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />NO DROP IN PSI <br />NO DROP IN PSI <br />NO DROP IN PSI <br />lCriteria: <br />i'lx <br />. Comments — (include information on repairs made prior to testing, and recommendedfbllow-s E�brLailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.