0 <br />SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM INSPECTION REPORT CONTINUED <br />Facility Kwik Serve (B&W Petroleum) Fa <br />Name: 2501 Jackson Ave, Date: AugEscalon Inspection <br />Name: 8, 2013 <br /># C1 C2M I Code Section <br />i l'. <br />702 CCR 2643(e) <br />703 CCR 2643(d) <br />999 Other: <br />VIOLATIONS <br />HSC = CA Health and Safety Code; CFR = <br />Biennial tightness test of gravity piping not <br />Triennial line test for conventional suction <br />See attached "Continuation — Official Insp( <br />= Class 2 vioianon; m = minor vioiavon <br />med (pre -January 1, 1984) <br />not performed (pre -January 1, 1984) <br />Report" for violation(s) not listed above. <br />(MI) <br />SUMMARY OF VIOLATIONS <br />CLASS I, CLASS II, or MINOR -Notice to Comply) <br />Onsite to conduct a routine UST inspection and observe Monitoring System Certification conducted on <br />August 8, 2013. This is a revised report issued on August 16, 2013 and it supersedes the report <br />issued at the time of inspection . Violations 109, 110, and 111 (for late annual monitoring system <br />certification, leak detector testing, and spill container testing) were added in the revised report. <br />Class II Violations: (109, 110, 111, 305, and 313) <br />109, 110, & 111. Annual monitoring system certification, leak detector testing, and spill container testing <br />were last performed on July 31, 2012 and was completed on August 8, 2013, 8 days past due. These <br />tests are required once every 12 months. Take all necessary precautions to ensure testing is performed <br />in a timely manner. <br />109. Annual monitoring system certification, leak detector testing, and spill container testing was <br />performed on July 31, 2012 and the test report has not been submitted to the EHD within the required <br />time frame. A copy of the test report must be submitted within 30 days of testing to the EHD. Ensure <br />that future reports are submitted to the EHD within the required time frame. <br />305. The Bravo box float and chain in the UDC 1/2 and UDC 3/4 sump failed to stop the flow of product <br />at the dispenser when tested. All monitoring equipment shall be maintained to activate an audible and <br />visual alarm or stop the flow of product at the dispenser when it detects a leak. The service technician <br />adjusted the chains and verified functionality. <br />313. The 87 -octane direct -bury spill container failed when tested. All spill containers shall have a <br />minimum capacity of five gallons and be capable of containing a spill or overfill until it is detected or <br />cleaned up. Immediately discontinue deposition of petroleum into this tank until the component is <br />repaired or replaced by a properly licensed, trained, and certified contractor under permit and inspection <br />of the EHD. If the spill container can't be replaced immediately, there is a possibility that the 87 -octane <br />UST system may be red tagged to prevent fuel inputs. <br />ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />EHD 23-02 Rev 04/19/12 Page 3 UST INSPECTION REPORT <br />