My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 12:06:22 PM
Creation date
6/23/2020 6:49:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231488_2501 JACKSON_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sugov.org/ehd <br />CONTINUATION FORM <br />Page: 4 of 4 <br />OFFICIAL INSPECTION REPORT <br />Date: 08/08/13 <br />Facility Address: 2501 Jackson Ave, Escalon <br />Program: UST <br />SUMMARY OF VIOLATIONS <br />CLASS I, CLASS II, or MINOR -Notice to Comply) <br />Minor -Notice to Comply: (105) <br />105. UST Facility Operating Permit Application and UST Tank Information for all existing site tanks are <br />not current in CERS; no overfill prevention method is identified. Immediately log into CERS, update the <br />required information, and submit for review by the EHD. Complete a separate tank form for each tank. <br />Complete and submit a copy of the Return to Compliance Certification form with a separate statement of <br />how each violation was corrected, including supporting documentation, by September 8, 2013, the <br />response to the newly added violations 109, 110, and 111 could be submitted to the EHD by September <br />16, 2013. <br />Note: Upon the inspector's arrival at the facility (inspector arrived prior to the scheduled start of the <br />monitoring system certification) it was noted that all the sump sensors were already lifted. As such, the <br />inspector was unable to verify the accurate placement of the sump sensors at the time of this inspection. <br />ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />EHD Inspector: <br />Received By: <br />Title: <br />Elena Manzo (209) 953-7699 <br />EHD 23-02-003 Rev 04/19/12 CONTINUATION FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.